Free Republic 3rd Qtr 2024 Fundraising Target: $81,000 Receipts & Pledges to-date: $3,137
3%  
Woo hoo!! And now less than $103 to reach 4%!! Thank you all very much!! God bless.

Keyword: designbuildwire

Brevity: Headers | « Text »
  • California Powers Up With Private Financing [Path 15]

    10/08/2004 4:28:24 AM PDT · by snopercod · 31 replies · 428+ views
    Engineering News Record ^ | October issue | Paul Rosta
    Design-build delivery rightfully has earned credit for unclogging many congested highways. But in a remote, rugged stretch of central California, design-build now is about to clear a different sort of traffic jam. In an innovative partnership teaming the U.S. Dept. of Energy, a private developer and an investor-owned utility, a contractor is completing an 84-mile, 500-kilovolt transmission line in the San Joaquin Valley that will relieve a longtime bottleneck on a grid segment called Path 15. The line’s 1,500 megawatts of additional transmission capacity will provide flexibility "to move generation up and down the state to meet the load demands,"...