Free Republic 2nd Qtr 2026 Fundraising Target: $81,000 Receipts & Pledges to-date: $6,846
8%  
Woo hoo!! 2nd qtr 2026 FReepathon is now underway!!

Keyword: terafab

Brevity: Headers | « Text »
  • Elon Musk's Terafab is coming, and you're not ready

    04/09/2026 12:30:05 PM PDT · by UMCRevMom@aol.com · 15 replies
    Tech by Blaze Media ^ | Pimentel April 07, 2026 | Stephen Pimentel
    "The super-factory will alter everyday life. If it actually happens. The announcement of Terafab was made at a decommissioned power plant, reflecting Elon Musk’s understanding of stagecraft: The ruined infrastructure of one era makes a convenient altar for the next. On March 21 and 22, 2026, at the Seaholm Power Plant in Austin, Musk presented Terafab. It is either the most ambitious semiconductor manufacturing project in history or a very expensive project that may not come to be. Terafab is a plan to build vertically integrated chip-manufacturing capacity in Austin, combining under one roof the design, fabrication, packaging, and testing...
  • Elon Musk just made his BIGGEST announcement ever

    03/21/2026 9:02:46 PM PDT · by SmokingJoe · 87 replies
    X ^ | 03/22/2026 | Jacob Hilton
    It's a ~24-minute video that primarily consists of a transcript/narration of a major speech by Elon Musk. In it, Musk announces a massive collaborative project between SpaceX, xAI, and Tesla to build what's called a "Terafab" — an unprecedented advanced chip fabrication facility (described as "the most epic chip building exercise in history"). Key points from the announcement: The goal is to produce 1 terawatt (1,000 gigawatts) of compute capacity per year, combined with terawatt-scale solar power — much of it deployed in space. This is framed as essential to advance humanity on the Kardashev scale (toward Type 1 civilization...