California is about to become home to the nation’s second electric vehicle-charging roadway — with construction due to be completed ahead of the 2028 Olympics in Los Angeles. The multimillion dollar UCLA project, funded with state grant moneys, will concentrate on a half-mile stretch of road in Westwood, according to the Los Angeles Times. And it will come as the university prepares to host the Olympic Village — where all of the competing athletes stay during the games. “A wireless inductive option is a game changer,” Clinton Bench, director of the UCLA Fleet and Transit, told the Times. “When a...