HOUSTON – Following 20 months of construction of the new Ship Channel Bridge along the Beltway 8, the county has issued a pause. Harris County Commissioner Adrian Garcia said the decision was made following the discovery of a design flaw with part of the bridge. “I want to make sure that we are doing everything on behalf of public safety to ensure that everything is well,” Garcia said. “This was obviously concerning and alarming for me." John Tyler, the deputy director of engineering with the Harris County Toll Road Authority and in charge of the project, said the flaw was...