PATUXENT RIVER, Md. (NNS) -- Shortly after Naval Air Systems Command (NAVAIR) announced the restarting of the Northrop Grumman Integrated Systems EA-6B outer wing panel production line in St. Augustine, Fla, a ceremony was held to commemorate the occasion on Dec. 17. The production line, which was formerly in Bethpage, N.Y., befire closing in 1987, is expected to produce 54 shipsets. Delivery of the first shipset is scheduled for July 2005. Once completed, the outer wing panels will be installed on Prowlers at fleet sites or at Navy depots. NAVAIR EA-6B Program Manager Capt. Ken Smolana who was on hand...