Free Republic 1st Qtr 2026 Fundraising Target: $81,000 Receipts & Pledges to-date: $10,128
12%  
Woo hoo!! And now less than $3.5k to reach 13,500 by the end of Jan 15th!! Thank you all very much!! God bless.

Keyword: mideastern

Brevity: Headers | « Text »
  • (Green Energy Fail) Testimony of Manu Asthana President and CEO, PJM Interconnection

    07/31/2023 5:21:11 AM PDT · by fruser1 · 5 replies
    PJM Interconnection ^ | 6/1/2023 | Staff
    The PJM fuel mix is balanced and diversified between different fuel types and we have adequate generation resources to serve the anticipated needs of our system today. However, as we look further out, maintaining an adequate level of generation resources will be essential for PJM’s ability to reliably serve electrical demand through the energy transition. Our recent analysis observed four trends that increase the risk that we may have difficulty maintaining such an adequate level of generation resources with the necessary attributes over time.1: The rate of electricity demand is likely to continue to increase from electrification and increasing deployment...
  • UNITED STATES SENATE COMMITTEE ON ENERGY & NATURAL RESOURCES Testimony of Manu Asthana President and CEO, PJM Interconnection

    07/29/2023 4:18:59 AM PDT · by fruser1 · 10 replies
    PJM Interconnection ^ | 6/1/2023 | Staff
    The PJM fuel mix is balanced and diversified between different fuel types and we have adequate generation resources to serve the anticipated needs of our system today. However, as we look further out, maintaining an adequate level of generation resources will be essential for PJM’s ability to reliably serve electrical demand through the energy transition. Our recent analysis observed four trends that increase the risk that we may have difficulty maintaining such an adequate level of generation resources with the necessary attributes over time.1| The rate of electricity demand is likely to continue to increase from electrification and increasing deployment...