Free Republic 3rd Qtr 2025 Fundraising Target: $81,000 Receipts & Pledges to-date: $12,863
15%  
Woo hoo!! And now less than $100 to reach 16%!! Thank you all very much!! God bless.

Keyword: iowadot

Brevity: Headers | « Text »
  • Contractor Warns I-74 Bridge ‘Not Buildable’

    01/02/2020 1:49:15 PM PST · by Tolerance Sucks Rocks · 40 replies
    Waterways Journal ^ | December 6, 2019 | Waterways Journal
    The lead contractor for a Mississippi River bridge is involved in a now-public feud with the state of Iowa over whether the bridge is buildable. The I-74 bridge is meant to replace a bridge on the same location connecting Moline, Ill, and Bettendorf, Iowa. Known as the Iowa-Illinois Memorial Bridge, the bridge is a pair of suspension bridges located near the geographic center of the Quad Cities. The original bridge was designed by engineer Ralph Modjeski. The first span opened in 1935 as a toll bridge. In 1961, an identical twin span, built from the same blueprint, opened to facilitate...