Did Construction Cause Collapse?
London Telegraph ^ | 8/4/07 | ReasonMcLucus

Posted on 08/04/2007 11:49:45 AM PDT by kathsua

I've been looking at some of the video showing the collapse of the I-35W bridge over the Mississippi River in Minneapolis and it looks like the collapse could have resulted from a major mistake by the company working on the bridge's surface. The bridge carries eight lanes of traffic, four each direction. To maintain an even load on the bridge supports during construction the contractor should have either worked on the two inside lanes of both sides of the bridge or the two outside lanes. Instead the contractor worked on the inside two lanes of one side and the outside two lanes on the other.

The result was the support on the side in which the outside lanes were carrying traffic had to support a greater load than the side on which the inside lanes carried traffic. I'm oversimplifing, but essentially the support on this particular side would have been carrying the load of the traffic directly above it as well as a portion of the traffic on the other side. The support on the other side would only have been carrying a portion of the load on its side.

If you've watched videos from the scene you know there is a school bus and semi truck next to each other in those outside lanes. There is another semi just behind them. These heavy vehicles went across the supports just before the collapse. The supports on this side of the river shifted toward this side with the roadway shifting toward the other side as if the weight of the heavy vehicles may have been too much for it to carry in a weakened state

My background is in math and physics rather than engineering so I'm not familiar the precise distribution of weight and how the supports carried it, but the basic math would indicate more stress on one side of the bridge than the other.

A computer analysis of the remains of the bridge and its design will be necessary to determine the precise amount of stress on the different pieces of the bridge and their physical condition. This analysis will show exactly which part(s) failed. Fortunately investigators have a computer program using Finite Element Analysis developed at the University of Minnesota.


TOPICS: News/Current Events
KEYWORDS: bridgecollapse; minneapolis
Navigation: use the links below to view more comments.
first previous 1-2021-4041-6061-8081-93 next last
To: kathsua
...“At the site, Hoeppner talked to construction workers who survived the fall. They had been doing repair work but expressed concern to him that the bridge had been wobbling several days before it collapsed. Every layer of concrete the workers removed, the bridge would wobble even more, they told Hoeppner.”...

Taken from here: http://www.startribune.com/10204/story/1343624.html

21 posted on 08/04/2007 12:56:50 PM PDT by FReepaholic (Boomchakalakalaka Boomchakalakalaka)
[ Post Reply | Private Reply | To 1 | View Replies]

To: kathsua

McLucus needs to stick to his day job. What does he think the load is in bumper-to-bumper traffic?

A truss bridge is a complex of triangles, the most stable connective load distribution arrangement around. Consider three popsicle sticks pinned in a triangle. Push (load it) at any point at it won’t budge, (A four-sided arrangement will collapse when you push nearly anywhere on it.) But remove just one of those pins in the triangle and it collapses.

Mr. McLucus, stick with long division.


22 posted on 08/04/2007 1:00:56 PM PDT by oldbill
[ Post Reply | Private Reply | To 1 | View Replies]

To: kathsua

Shifting the weight of the traffic around was probably just the straw that broke the camel’s back.


23 posted on 08/04/2007 1:02:06 PM PDT by P-40 (Al Qaeda was working in Iraq. They were just undocumented.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: lesser_satan
Oops! Armies don’t march across bridges, they ride across in trains, trucks, tanks, etd. But you are right, and steady cadence on a suspended structure can cause it to begin to sway and vibrate.

The bridge probably fell because its “weakest link” somewhere broke and the rest followed.

24 posted on 08/04/2007 1:04:34 PM PDT by R.W.Ratikal
[ Post Reply | Private Reply | To 9 | View Replies]

To: lesser_satan
Oops! Armies don’t march across bridges, they ride across in trains, trucks, tanks, etd. But you are right, and steady cadence on a suspended structure can cause it to begin to sway and vibrate.

The bridge probably fell because its “weakest link” somewhere broke and the rest followed.

25 posted on 08/04/2007 1:04:41 PM PDT by R.W.Ratikal
[ Post Reply | Private Reply | To 9 | View Replies]

To: Perdogg
The bridge was built and finished circa 1966/67. 40, 41 years ~ plus the time the materials were outside in a yard being prepped for shipment to the site ~ where in the world did you get 17 years?

Oh, yeah, welcome to the debate Perdogg ~ we've had quite a few engineers, traffic analysts and public infrastructure planners come onto the various threads.

So, here's what one/several said: The weight of the maintenance contractor's equipment on that bridge was miniscule. It was designed and built to accommodate peak traffic which would be wall-to-wall cars and trucks PLUS ice and snow load PLUS 100% of that as a hedge.

The problem seems to be that the bridge design (which hasn't been used since 1973 when it the standards for bridges of this size and type were changed) can result in a total bridge failure if only one structural member fails.

It's called a "non redundant" bridge design.

26 posted on 08/04/2007 1:09:41 PM PDT by muawiyah
[ Post Reply | Private Reply | To 2 | View Replies]

To: kathsua

Ever since the Tacoma Narrows Bridge < http://en.wikipedia.org/wiki/Tacoma_Narrows_Bridge >disaster in 1940, bridge designs are studied and built to take on all the worst-case possible scenarios. This includes a packed bridge, a bridge with harmonic driven loads traveling at resonant frequencies, severe wind, ice load, pavement crumbling, corrosion, etc. After that, the standard is to make it atleast 50% stronger, and today more like 100% stonger.

The one thing that can be and is often overlooked is the processes and decisions made during the original construction. Poor steel quality, poor workmanship, poor welds, poor joints, poor maintenance, mis-assembly, poor concrete etc.

An example of one of these that occurred was in a Kansas city hotel where a set of stacked catwalks were designed with an inherently difficult build specification, and the builder asked for a design change. A Licensed Professional Engineer signed off on the proposed change, which was the seed fault in the collapse. Instead of having each of the two decks of catwalk hand independently on the cables (This would be like you hanging on a rope by your hands, and the person below you hanging separately on the same rope), the cables were daisy chained. (This would be like you hanging on a rope by your hands, and the person below you hanging by your legs instead of the rope. At some point you are going to lose your grip when the load gets to be too big),

Many failures have happened due to “overbuilding” where a structure has adders built on, beyond the capability of either the design or the construction to hold the additional load.

I would LOVE to be on the investigation team on this accident. However, I’m betting that a PC team will be assigned this duty instead. It will probably be called an “freak accident” so no one’s feelings get hurt.


27 posted on 08/04/2007 1:17:37 PM PDT by HighWheeler (A true liberal today is a combination of socialist, fascist, hypocrite, and anti-American.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: Perdogg
If the bridge was only 17 years old I doubt it was caused by structural failure.

OK, but what does that have to do with the collapse of a bridge where construction started 43 years ago?

28 posted on 08/04/2007 1:21:41 PM PDT by PAR35
[ Post Reply | Private Reply | To 2 | View Replies]

To: MNJohnnie
Bridges are weirdly sensitive to vibration.

Something that I thought about, is that they were laying asphalt topping. I don't know what they were using to flatten the surface, but if they were using one of these 25 ton machines:

The vibrations could have been a contributing factor. When the city repaved or street about three weeks ago, this is what they used to smooth the surface. My entire house was shaking and the windows rattled. No telling how many were on the bridge at any given time.

29 posted on 08/04/2007 1:31:35 PM PDT by Arrowhead1952 (Stop the invasion. Secure the borders now.)
[ Post Reply | Private Reply | To 4 | View Replies]

To: kathsua
Fascinating stuff. This is why I am a creative person and do not build bridges. (Although I definitely believe in addition to the physics and engineering, bridge building too is an incredible art form.)

Physics is so cool, the complexity at this level when it takes into consideration all the anticipatory problem solving and what ifs of loading bearing etc ahead of time are just too much for my imaginative, tangential oriented mind to handle.

Kudos to you Structural Engineers and Physicists out there. Glad God made us all differently. :-).

30 posted on 08/04/2007 1:37:23 PM PDT by GOP Poet
[ Post Reply | Private Reply | To 1 | View Replies]

To: FReepaholic

‘many officers were in spots that didn’t allow radio communication’

Shall I assume Big Brother has jamming equipment to negate cell phone detonation of IED’s ? Just wondering....


31 posted on 08/04/2007 1:41:32 PM PDT by Westlander (Unleash the Neutron Bomb)
[ Post Reply | Private Reply | To 21 | View Replies]

To: kathsua
I build and rebuild bridges, when the project is bid the Owner provides staging plans...these plan account for the changes in loading of the structural members as deck slabs are removed and replaced and steel members are removed and replaced...you cannot deviate from them without the written permission of the Designer/Engineer who works for the Owner.

From the video I saw showing the collapse, it appears a cord failed...like breaking a string of tightly stretched beads at one end...the bridge appeared to fail from west to east, not in the center.

32 posted on 08/04/2007 2:01:56 PM PDT by Rumplemeyer
[ Post Reply | Private Reply | To 1 | View Replies]

To: NorthWoody; Manic_Episode; mikethevike; coder2; AmericanChef; Reaganesque; ER Doc; lesser_satan; ...

WELCOME TO FREE REPUBLIC’S MINNESOTA PING LIST!

83 MEMBERS AND GROWING...!

FREEPMAIL ME IF YOU WANT ON OR OFF THIS LIST!


33 posted on 08/04/2007 2:15:02 PM PDT by MplsSteve
[ Post Reply | Private Reply | To 1 | View Replies]

To: Rumplemeyer
I’ve studied the photos and i think the bridge failed just above the southeast support. Everything else happened in quick succession as the emtire structure slipped off the 4 supports.
34 posted on 08/04/2007 2:16:41 PM PDT by John Jamieson
[ Post Reply | Private Reply | To 32 | View Replies]

To: Westlander

Funny you should mention that.

I was having dinner with the Parental Unit (aka my Mom) last night and she was in a marching band back in the late 50’s.

She said that whenever they crossed a bridge, they broke any kind of marching cadence they had.


35 posted on 08/04/2007 2:18:13 PM PDT by MplsSteve
[ Post Reply | Private Reply | To 16 | View Replies]

To: kathsua
To maintain an even load on the bridge supports during construction This premise is flawed. Bridges and buildings are designed for multiple loading patterns to find the that which causes the most critical stress in members. No engineer expects any structure to simply carry an "even" load. By the way, the jargon commonly calls this a uniform load. Other statements in the article point to an ignorant author attempting to speculate about a problem beyond his capability.
36 posted on 08/04/2007 2:27:37 PM PDT by LoneRangerMassachusetts (The only good Mullah is a dead Mullah. The only good Mosque is the one that used to be there.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: LoneRangerMassachusetts; All
Here's an interesting
"blog" from a scientist who
suggests a new way

to design bridges.
It's a little off-topic,
but it's a fun read:

The Space of All Possible Bridge Shapes, August 3, 2007   Stephen Wolfram
37 posted on 08/04/2007 2:33:04 PM PDT by theFIRMbss
[ Post Reply | Private Reply | To 36 | View Replies]

To: Perdogg

Best bet is shabby construction in the first place and a lot of rake off by the contractors.


38 posted on 08/04/2007 2:37:33 PM PDT by TASMANIANRED (Taz Struck By Lightning Faces Battery Charge)
[ Post Reply | Private Reply | To 2 | View Replies]

To: theFIRMbss
Here's an interesting "blog" from a scientist who suggests a new way

It would be simpler and cheaper to use more steel and increase the strength of the members in the present design, or make suspension or stayed bridges as commonly done. The idea of adding many more "components" in a network are counter productive. They add connections which are expensive and a maintenace problem.

39 posted on 08/04/2007 2:43:30 PM PDT by LoneRangerMassachusetts (The only good Mullah is a dead Mullah. The only good Mosque is the one that used to be there.)
[ Post Reply | Private Reply | To 37 | View Replies]

To: LibFreeOrDie
I guess they didn't have resonance problems on the Golden Gate Bridgewalk "87 when: It is estimated that nearly 300,000 people surged onto the roadway. (scroll to bottom)

The arch of the roadway flattened out!
To see how visible the flattening was link to the full size at flikcr. (click "all sizes")

40 posted on 08/04/2007 2:46:19 PM PDT by skeptoid (AA, UE, MBS (with clusters))
[ Post Reply | Private Reply | To 19 | View Replies]


Navigation: use the links below to view more comments.
first previous 1-2021-4041-6061-8081-93 next last

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
News/Activism
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson