“...3G is about to go. Chyna is preparing their people.”
***********************************************************
The operator of the dam was forced to admit last Saturday that it has “deformed slightly,” with peripheral parts of its 1.5-mile span buckling.
I’m not that kind of damn engineer, but I’m thinking once it starts deforming and buckling, with even more rain coming, then it’s really just a matter of time. It’s not like it’s going to “get better”.
HLB....
Yer:
“The operator of the dam was forced to admit last Saturday that it has deformed slightly, with peripheral parts of its 1.5-mile span buckling.”
Here you be! See it with your own eyes!
https://youtu.be/n6QyfrS7ARI?t=124
Apparently one critic indicated that the concrete was not connected to the bedrock below, the poured blocks are just sitting on top of it. Humm.