“I was a rigger for this” Hey Swampsniper, found this on YouTube, never saw it but would love to see all of it -
http://www.youtube.com/watch?v=b5lxyKuBCSE
The Cruz had all steel standing rigging, we had to cover it all for the movie. They had 4 strand coca fiber rope from the movie Cleopatra. We would start at the top in a bosuns chair, unlay the 4 strand a bit at a time, and cover the steel cable.
We worked at the Merril Stevens Yard in Miami. The girls would cross the bridge at 12th Ave. and honk, if you couldn't get a date almost every day something was bad wrong, LOL.
They made some fake yards out of plywood, just a skin over ribs and struts. Those were the ones to be dropped on deck.
I didn't really know what I was doing, spent a long weekend in the Coconut Grove library and got up to speed. Most of the riggers ended up there with me, we all had sail experience but not what we really needed. We got it done!