Posted on 05/22/2023 5:37:19 PM PDT by george76
Scottish Power admitted 71 of its windmills were hooked up to the fossil fuel supply after a fault developed with their power supply.
Dozens of giant turbines on Scotland’s windfarms have been powered by diesel generators, the Sunday Mail can reveal. Scottish Power admitted 71 of its windmills were hooked up to the fossil fuel supply after a fault developed on the grid.
The firm said it was forced to act in order to keep the turbines warm during very cold weather in December. But a whistleblower has told the Sunday Mail the incident is among a number of environmental and health and safety failings.
The worker, who asked to remain anonymous, said: “The Scottish Government wants to make our country attractive to foreign investors as 40 per cent of the wind that blows across Europe blows across Scotland. However, that should not mean we put up with our waterways and nature being polluted with carbon from diesel generators and hydraulic oil.
....
“People should be aware that, while their energy costs continue to rise, our windfarms are not operating as efficiently as they could be due to corporate greed.”
Labour’s South Scotland MSP Colin Smyth said: “The SNP and Greens have proven time and time again they cannot be trusted on environmental issues. They laud Scotland’s potential for renewables, yet don’t appear to ensure those already in existence are properly run. This isn’t the first problem raised about this site and there is concern at a lack of openness when problems arise.
"Whatever the reasons, having to use diesel generators to de-ice faulty turbines is environmental madness. This level of dishonesty cuts to the very core of the SNP and Green Government where their rhetoric on net zero is very different from the reality."
...
Sixty turbines at Arecleoch Wind farm and 11 at Glenn App near Cairnrayn in South Ayrshire were affacted and connected to six huge diesel generators. The windfarms are operated by Scottish Power Renewables, a subsidiary of Spanish-based Iberdrola, which operates 1183 onshore turbines which can produce enough electricity to power two million homes.
But the whistleblower revealed how they had to bring in generators after the issue was discovered.
The worker said: “During December 60 turbines at Arecleoch and 11 at Glenn App were de-energised due to a cabling fault originating at Mark Hill wind farm. In order to get these turbines re-energised diesel generators were running for upwards of six hours a day.”
...
He also claimed there had been other technical issues and environmental problems discovered. They include:
Turbines left operating on half power for long periods due to faulty convertor modules. Others in “test mode” where they take rather than contribute electricity to the grid. Over 4000 litres of oil leaked from hydraulic units on turbines and sprayed over the countryside. Concerns about safety standards and transparency. The whistleblower said: “Turbines are regularly offline due to faults where they are taking energy from the grid rather than producing it, and also left operating on half power for long periods due to parts which haven’t been replaced.
"Dirty hydraulic oil is also regularly being sprayed out across the Scottish countryside due to cracks in mechanisms. Safety standards have not improved since a worker was killed in 2017 at Kilgallioch wind farm.”
We revealed last year how the chairman of ScottishPower, Spaniard Ignacio Galan, earned over £11million in 2021. He took home the massive package as millions of customers face being plunged into poverty by rocketing fuel costs.
A spokesman for Scottish Power confirmed diesel generators were used for a “short period of time” due to an “external fault on the GB network” which left three windfarms unable to operate during extreme cold weather in December.
“So you’re saying that the device that generates power needs a separate power supply to operate the controls for the power generating device?”
At nuclear power plants there is an independent source of incoming power AND diesel generators for back-up.
The design of Fukushima specified that the diesel tanks were to be mounted inside the protective wall. Some genius put them outside the wall. Flood from Tsunami washed them away!!
What’s really funny is the “whistleblower” is not angry about the hypocrisy of it all, but rather, is whining the wind farms should be even more “green.”
You cannot dispatch “green power”. Period.
It’s the most retarded thinking imaginable.
could be due to corporate greed
`````````````````````````````````
One of the most favored buzz phrases of liberalism.
When wind turbines aren’t producing power they are consuming it. Same with any power plant you’ve got to keep the lights on and the coffee hot. Plus the tvs on so they can watch porn or the World Cup.
I know. Trust me. I know!
IIRC, restarting the grid after the Great Northeast Blackout of 1967 was difficult as it was hard to find any electricity anywhere.
ROFL!!!
Yeah ...
Leftists lie.
All the time.
About everything.
Sharks bite.
Skunks stink.
Leftists lie.
It's their nature; it's what they do.
Nobody apparently paid attention to the ancient tsunami marker stones ...
Then these folks go out and brag about how great they are doing with all this wind power. What a joke.
Yes, that’s exactly right. When everything goes black, you’ve got a serious problem getting going again.
Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.