Free Republic
Browse · Search
News/Activism
Topics · Post Article

Skip to comments.

NOT YOUR “FATHER’S AEGIS” (100+ plus ships in service)
Center for International Maritime Security ^ | NOVEMBER 21, 2014 | Robert Holzer and Scott C. Truver

Posted on 11/21/2014 5:39:43 AM PST by sukhoi-30mki

“Stand by, Admiral Gorshkov, Aegis is at Sea!”

The U.S. Navy’s first Aegis-equipped surface warship, the USS Ticonderoga (CG-47), joined the Fleet in January 1983, and all-but dared the Soviet Navy to take its best anti-ship cruise-missile shot.

The Navy’s newest Aegis guided-missile destroyer in the fall 2014, the USS Michael Murphy (DDG-112), was commissioned in December 2012. Murphy is the Navy’s 102nd Aegis warship. Another 10 Aegis DDGs are under construction, under contract or planned––a remarkable achievement!

Aegis surface warships were conceived during the height of the Cold War to defend U.S. aircraft carrier battle groups from massed Soviet aircraft and anti-ship cruise missile attacks. With the early retirements/layups of as many as 16 of 27 Aegis cruisers (beginning with Ticonderoga’s decommissioning in September 2004), some observers characterize the Aegis Weapon System (AWS) as an old, legacy program, whose time has passed.

This is just plain wrong. No other naval warfare capability has experienced more upgrades and significant changes over the years than Aegis. As global threats evolved and new missions emerged, so too have Aegis’ capabilities “flexed” to meet increasingly daunting operational demands. Even more advanced versions of Aegis are planned in the years ahead.

To paraphrase a classic 1990s Oldsmobile commercial: This is not your “father’s Aegis!”

Aegis: Don’t Leave Homeports without It

DN-SC-84-10077Without doubt, the Aegis Weapon System in 1983 represented a true revolution in shipboard air defense. Based on an enormous investment in time, resources and management focus, Aegis was the first truly integrated ship-based system. It brought together radar and sensor detection, tracking and missile interception into a coherent, well-integrated weapon system. This was a staggering engineering achievement for the time. And was the culmination of nearly 40-years of Navy experience in confronting and overcoming ever more dangerous air defense challenges, beginning with kamikaze attacks in the waning months of World War II and extending to Soviet Backfire bombers in the 1970s and 1980s.

Originally focused primarily on the fleet air defense/anti-air warfare mission—hence, the “Shield of the Fleet” slogan––Aegis has steadily expanded its mission set over the decades to successively include cruise missile defense, area theater ballistic missile defense, integrated air and missile defense (IAMD), and longer-range ballistic missile defense (BMD) cued by space-based sensors. (In Greek mythology, Aegis was the shield wielded by Zeus.) As more advanced radars and missiles enter the inventory in coming years, Aegis will play an increasingly important role in national BMD, too. During the past 30 years, Aegis has expanded beyond the original 27 Ticonderoga-class cruisers to also include the entire fleet of 75 Arleigh Burke-class guided missile destroyers. In mid-2014, Aegis is deployed on 84 ships: 22 cruisers and 62 destroyers. Thus, Aegis is no longer just the “backbone” of the surface fleet, but constitutes its “central nervous system” as well.

Build a Little…

Critical to Aegis’ ability to evolve and defeat new threats—some only dimly seen when the program was conceived more than 40 years ago—has been an enormous capacity for growth that was built into the system from its very beginning. This growth in mission capacity can be attributed to the late-Rear Adm. Wayne E. Meyer, who guided the development of Aegis and worked tirelessly to ensure the architecture retained sufficient flexibility to accommodate future changes in threats, missions and technology. Long known as the “Father of Aegis,” Meyer trusted empirics and not analytics. In his view, the real ground truth that undergirds weapon system performance comes from engineering or operational test data. As such, he embraced a simple, but powerful, management mantra: “Build a little, test a little, learn a lot!”

Meyer’s technical and engineering driver was the warfighting requirement to get an interim, initial Aegis capability into the fleet to solve the warfare problem: “Detect, Control and Engage.” Rear Adm. Timothy Hood, the Naval Sea System Command (NAVSEA) program executive officer for theater air defense in the early 1990s, would say whereas detect-control-engage identified the Aegis warfare problem, build-a-little, test-a-little, learn-a-lot described the Aegis process. The specific functional/performance cornerstones of Aegis then put real numbers to the capabilities Aegis engineers were striving to meet—all to achieve the ultimate objective of putting Aegis to sea. (1)

Aegis cornerstones have guided the program for more than four decades. Fundamentally, Meyer made project decisions based on the best technical approach. As such, he instilled a rigorous systems engineering discipline in the Aegis program and established key performance factors. He then defined these factors to be quantitatively expressed to serve as guidance for engineering trade-offs and compromises to address the detect-control-engage warfare problem. These cornerstones required constant attention and were reflected in what Meyer called “people, parts, paper and [computer] programs.”(2)

In the end, Meyer successfully translated the Aegis cornerstones into acquisition process principles that informed decision-making at every level. To keep Aegis system-engineering development moving forward in advance of a Navy decision on ship design, Meyer employed the so-called Superset design and engineering approach. Superset called for integrating the largest set of combat system elements (sensors, control systems and weapons) and then down-designing that superset of capabilities to meet specific ship suites when finally approved. The payoff was in getting Aegis to sea on budget, on time. This philosophy continues to animate the Aegis program.

Baseline Continuous Improvement

uss-chosinMeyer’s project office opted to introduce initial, interim capabilities via continuous construction lines for cruisers and destroyers (rather than expensively introducing new ship classes with block upgrades) to accommodate Aegis advances. The engineering development approach that enabled this decision was a process practice called the Aegis Combat System Baseline Upgrade Program. Each Aegis Baseline—focused primarily on major systems and upgrades—was an engineering package of improvements introduced on two-to-four year cycles. A major warfighting change—for example, the introduction of the Mk 41 Vertical Launching System (VLS), Tomahawk Land-Attack Missile (TLAM) and an integrated anti-submarine warfare (ASW) suite into Aegis—would call for a new engineering baseline. The introduction of these three components in fact constituted Aegis Baseline 2. In addition, the Baseline Upgrade Program allowed for retrofits. Under the principle “Forward Fit before Backward Fit,” engineering and design focused on new construction ships while at the same time enabling cost-effective retrofits of Aegis ships already in the fleet.

To ensure Aegis outpaces today’s developing threats, Navy program officials with the Program Executive Office for Integrated Warfare Systems (PEO IWS) now exercise development and management oversight for service combat systems to inject new capabilities into Aegis through this time-tested approach to upgrades and improvements. Today’s baselines continue to be added to new ships during their construction phase and deployed ships when they undergo their specified shipyard maintenance cycles.

Initial baselines focused on adding only a few, discrete upgrades to Aegis. As this process has matured and Navy program engineers and system designers have accumulated more experience in understanding the nuances of Aegis baseline upgrades, their complexity, capabilities and capacities have grown exponentially. Baselines have grown in terms of the amount of new capabilities added to Aegis at each modernization interval to address both the pace of technological change and the acceleration of new threats and challenges. This is an ever-expanding OODA (Observe, Orient, Decide and Act) loop that Aegis is well accustomed to facing.

As of the fall 2014, a total of eight specific baselines have been fielded across the fleet of Aegis-equipped ships. A more advanced Baseline 9 version is undergoing its operational test and evaluation phase and will be deployed next year.

Baseline upgrades have added the following key capabilities to Aegis-equipped cruisers and destroyers over time since Baseline 0 that went to sea with the first Aegis warship, Ticonderoga. Within these numbered baselines, multiple versions at times have been introduced to accommodate minor variations to a particular Aegis combat system element development or shipbuilding program. Broadly stated, these baseline upgrades include:

Baseline 1: The original Aegis system attributes deployed on the first Ticonderoga-class cruisers (CGs 47-51) that consisted of the SPY-1A radar, the Mk-26 trainable launcher and the Navy’s mil-spec UYK-7 computers. Baseline 1 equipped the first five Aegis cruisers with the final combat system computer program whose configuration was based on the lessons learned from Ticonderoga’s first deployment.

Baseline 2: The first real upgrade to Aegis deployed on the next tranche of cruisers (CGs 52-58) that introduced, as stated above, the Mk 41 VLS, Tomahawk and an upgraded ASW suite, the SQQ-89, with the SQS-53B sonar. Introduction of VLS and Tomahawk gave Aegis cruisers a long-range strike, land-attack capability. As well, the VLS cells led to use of the larger, more capable SM-3 missile that would greatly expand Aegis air defense capabilities to include BMD.

Baseline 3: These upgrades were added to the later-built cruisers (CGs 59-64) and included the more advanced SPY-1B version of the radar, along with the SM-2 Block II missile and new UYQ-21 computer consoles. By enabling use of the SPY-1B, this baseline was a major capability enhancer with respect to electronic counter-counter measures (ECCM).

Antenna_suite_on_CG-60_Normandy_AEGIS_cruiserBaseline 4: This baseline was the first to accommodate both cruisers and destroyers. Improved capabilities were added to the final lot of cruiser construction (CGs 65-73) and the first construction lot of the newer Arleigh Burke-class destroyers (DDGs 51-67). The new capabilities added to the cruisers included the next-generation UYK-43/44 computers and the latest-version of the SQS-53C sonar. The DDG upgrades included the new SPY-1D radar, SQQ-89(V) ASW system and UYK-43/44 computers. Of note, the SPY-1D, though identical to the SPY-1B, required only a single deckhouse in the destroyer superstructure since it used only a single set of power amplifiers (instead of the two in the fore and aft deckhouses on the cruisers). Later the SPY-1B(V) radar was retrofitted to the cruisers beginning with CG-59.

Baseline 5: These upgrades were targeted to Burke-class destroyers (DDGs 68-78) and consisted of SPY-1D radar, SLQ-32 electronic countermeasures system, SM-2 Block IV missile, Link-16 system and Combat Direction Finding. Introduction of this baseline required a major effort in the track file and associated track processing in the command and decision (C&D) display enabling Aegis to become a major player in battle group networks.

Baseline 6: Brought a significant list of new capabilities to Aegis destroyers (DDGs 79-90) including SPY-1D(V) with modifications for littoral operations. It introduced the Cooperative Engagement Capability (CEC), Evolved Sea Sparrow Missile (ESSM) and UYK-70 display consoles. Baseline 6 was a notable transition from a Navy mil-spec-based combat system to one with a fully commercial-off-the-shelf (COTS) hardware environment. A mil-spec/COTS hybrid, it was the first forward fit of COTS computers for tactical purposes that provided area air warfare, CEC and an area theater ballistic missile defense (TBMD) capability for Baseline 6 DDGs and six upgraded Baseline 6 cruisers.

Aegis-Destroyer-Dewey-DDG-105 (1)Baseline 7: The last baseline designed specifically for forward-fit into new construction ships, it represented a full conversion to commercial computers, i.e., the complete transfer to COTS processing. The baseline added the Tomahawk fire control system upgrade and Theater Wide BMD to Burke-class destroyers (DDGs 91-112). The introduction of the third-generation SPY-1D(V) radar provided major performance enhancements against stealth threats and all threats in the littoral environments. Baseline 7 DDGs had the capability for network-centric operations: they were enabled to employ the so-called Tactical Tomahawk that was reprogrammable in-flight, e.g., for use against ships and mobile land-attack targets.

Baseline 8: Brought COTS and open architecture to Baseline 2 equipped Aegis cruisers. The baseline captured tailored upgrades from new construction Baseline 7.1R destroyers (DDG 103-112), bringing the seven cruisers greater capacity for technical data collection and enhanced area air warfare and CEC.

Baseline 9: The latest version of the long-running and highly successful Aegis upgrade process, this baseline will bring significant improvements to the Fleet in several key respects. The new baseline brings radical changes to the software environment creating a true open-architecture computing framework. Common source code shared among Baseline 9 variants enhances software development, maintenance and re-use, boosting the capability to support combat system interoperability improvements and enhanced capacity and functionality.

Major Warfighting Improvements

Baseline 9 will deliver three major warfighting capability improvements. These are: the Naval Integrated Fire Control-Counter Air (NIFC-CA), Integrated Air and Missile Defense and Enhanced Ballistic Missile Defense.

The NIFC-CA capability for Baseline 9 cruisers and destroyers provides integrated fire control for theater air and anti-ship cruise missile defense, greatly expanding the over-the-horizon air warfare battle space for surface combatants by enabling third-party targeting of threats and use of “smart” missiles. NIFC-CA is valuable since it will allow greater performance of the Aegis radar over land and in the congested littorals where radar signals can be degraded given the topography and other local conditions. NIFC-CA allows Aegis to conduct over-the-horizon targeting using Standard anti-air missiles against targets based on data and other information received via the CEC net from off-board sensors such as enhanced E-2D Hawkeye aircraft.

/Users/Photo2/Desktop/IPTC.IPTIAMD brings the Fleet a more comprehensive capability to conduct ship self-defense, area air defense and ballistic missile defense missions at the same time. A core Navy mission driving capabilities for mobile, persistent, multi-mission Surface Forces, IAMD enables Aegis-equipped ships to optimize shipboard radar resources rather than forcing the radar to devote its energy to only one mission at a time. This full-up capability in all air- and missile-defense domains represents another major advance in the continuously evolving AWS capabilities against emerging threats. The Aegis SPY-1D radar uses the new Multi-Mission Signal Processor (MMSP) software package that is the centerpiece of IAMD. The MMSP integrates signal-processing inputs from the combat system’s BMD signal processor and the legacy Aegis signal processor for the radar. Prior to MMSP a ship had to devote the bulk of her radar’s power resources to tracking the more demanding BMD threat with a corresponding diminution to the air defense mission.

navy-sm-6Enhanced BMD comes with Baseline 9’s open architecture environment that will provide both a launch-on remote (LoR) and engage-on-remote (EoR) capability for Aegis where the interceptor missile uses tracking data provided from remote, off-board (land, sea, airborne and space-based) sensors to launch against and to destroy missile threats. Previous baselines have progressively expanded the LoR capability for Aegis BMD “shooters” to launch missile interceptors earlier in the target missile’s trajectory. Baseline 9’s open architecture will accommodate the Aegis BMD 5.1 system software upgrade to enable an engage-on-remote capability that advances launch-on-remote by providing an organic track to the interceptor missile late in its flight. To the extent that LoR and EoR can provide enhanced capability to the Block IA, IB and IIA versions of the Standard missile—supported by a netted sensor framework—they have the potential to provide BMD to strike group and homeland defense missions.

Ultimately, EoR will enable the shooter to complete the intercept. LoR and EoR thus add to layered defense, a critical capability for the successful intercept of longer-range and fast-flying missiles. When launch-on-remote and engage-on-remote become operational, the Aegis system can reach further into the joint and combined arenas. For example, Aegis open architecture provided by the Aegis BMD 5.0 family of system software upgrades will make it easier for allies and partners to integrate new weapon systems and sensors into their Aegis systems. This enhanced network integration will legitimize the concept of “any sensor, any shooter” to extend the battlespace and defended area.

Past Being Prologue…

Aegis has enjoyed a remarkable history in the U.S. Navy—as well as several foreign navies––and with the deployment of the new Baseline 9 version, and most likely other upgrades coming, there is no final chapter yet to be written for this workhorse capability. Aegis has truly evolved from the “Shield of the Fleet” to the Fleet’s “Central Nervous System” and more. A system originally designed to launch surface-to-air missiles against air-breathing bombers and cruise missiles has evolved into a networked combat system that can target land-launched ballistic missiles and even satellites in space—and destroy them. While its roots are traceable to the Cold War, Aegis is firmly focused on overcoming the challenges and threats the U.S. Navy faces in tomorrow’s murky and increasingly dangerous future.

Robert Holzer is senior national security manager with Gryphon Technologies’ TeamBlue National Security Programs group. Dr. Truver is TeamBlue’s director.


TOPICS: Foreign Affairs; News/Current Events
KEYWORDS: aegis; spy1; usn

USS Dewey

1 posted on 11/21/2014 5:39:43 AM PST by sukhoi-30mki
[ Post Reply | Private Reply | View Replies]

To: sukhoi-30mki

2 posted on 11/21/2014 5:40:47 AM PST by sukhoi-30mki
[ Post Reply | Private Reply | To 1 | View Replies]

To: sukhoi-30mki

That would make your fillings hum.


3 posted on 11/21/2014 5:57:54 AM PST by dljordan (WhoVoltaire: "To find out who rules over you, simply find out who you are not allowed to criticize.")
[ Post Reply | Private Reply | To 2 | View Replies]

To: sukhoi-30mki

Good news on the Navy front.


4 posted on 11/21/2014 6:01:54 AM PST by armydawg505
[ Post Reply | Private Reply | To 2 | View Replies]

To: sukhoi-30mki

Interesting that this comes out after the “reported” (by Russian sources) events of the USS Donald Cook flyover.

And this from just yesterday:
FDRMC Completes First Selected Restricted Availability on USS Donald Cook
“Her short 100-day selected restricted availability (SRA) was scheduled from Sept. 24 until Nov. 12, and was filled with maintenance, modernization, and assessments, such as the BMD readiness assessment, which are usually done after the completion of an availability.”
http://www.navy.mil/submit/display.asp?story_id=84515

I have NO idea if the two are related.


5 posted on 11/21/2014 6:05:15 AM PST by tcrlaf (They told me it could never happen in America. And then it did....)
[ Post Reply | Private Reply | To 1 | View Replies]

To: armydawg505

This must be fiction. I saw on FR that the Russians can shut it down with one aircraft and cause the crew to cut and run.


6 posted on 11/21/2014 6:06:21 AM PST by mad_as_he$$
[ Post Reply | Private Reply | To 4 | View Replies]

To: sukhoi-30mki

I miss the big guns.


7 posted on 11/21/2014 6:28:45 AM PST by ImJustAnotherOkie (zerogottago)
[ Post Reply | Private Reply | To 1 | View Replies]

To: sukhoi-30mki

All controlled by computers whose chips were made in China...


8 posted on 11/21/2014 6:49:36 AM PST by null and void (The better I know obama, the less I fear a president Biden.)
[ Post Reply | Private Reply | To 2 | View Replies]

To: sukhoi-30mki

I need one and maybe a spare.


9 posted on 11/21/2014 6:52:28 AM PST by Vendome (Don't take life so seriously-you won't live through it anyway-Enjoy Yourself ala Louis Prima)
[ Post Reply | Private Reply | To 1 | View Replies]

To: ImJustAnotherOkie

This really misses the full impact of the VLS (Vertical Launching System). These ships now have 128 launching cells (as opposed to 88 anti-air only) which can accommodate any missile configuration (anti-air, anti-ship, anti-sub, ballistic missile defense or land attack). Thus, each ship loading of missiles can be tailored to the evolving mission requirements. For instance, the loadout of Tomahawk missile has been increased form 8 to 128 - this was used in Desert Storm. The launcher identifies the missile type, selects the correct missile, and launches it without any adaptations or modifications. This has significantly changed the stature and roles of this amazing fighting system.


10 posted on 11/21/2014 7:05:00 AM PST by impactplayer
[ Post Reply | Private Reply | To 7 | View Replies]

To: sukhoi-30mki

I served on an old DD commissioned in 1945 in Vietnam. We had double 5”/38 guns, asroc’s, and torpedo tubes (don’t know if there were any torpedo’s in them.) I would have loved to sail on one of these new Aegis ships.


11 posted on 11/21/2014 7:12:18 AM PST by longhorn too
[ Post Reply | Private Reply | To 1 | View Replies]

To: impactplayer

Tomahawks, the weapon of choice when you want to send a message.


12 posted on 11/21/2014 7:21:23 AM PST by ImJustAnotherOkie (zerogottago)
[ Post Reply | Private Reply | To 10 | View Replies]

To: sukhoi-30mki

When do they start marketing the home version for taking out annoying drones?


13 posted on 11/21/2014 7:25:43 AM PST by nascarnation (Impeach, Convict, Deport)
[ Post Reply | Private Reply | To 1 | View Replies]

To: sukhoi-30mki

The best weapons system in the world are useless without the will to use them.


14 posted on 11/21/2014 8:16:20 AM PST by buckalfa (Long time caller --- first time listener.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: sukhoi-30mki
Good the upgrading is ongoing.

Funny story, We had to do some electromagnetic compatibility testing onboard the then new CG-49 Valley Forge out of San Diego. One of the Chiefs gave us a tour of the radar hardware spaces. We and he got a great laugh out of the 5 MEGABYTE hard drives that were the size of a small two drawer filing cabinet. The computer tech being used in the 1986-7 time frame was already hilariously far behind. We had our spectrum analyzer running, so they gave us a demo of how they can control their radiated spectrum. Was classified at the time, but very unique for a radar to do what it could do.

Could see why it is so hard to jam. Worked with a guy at Pt Mugu whose sole job was to come up with jamming threats against Aegis. He spent a lot of time analyzing commie hardware info and trying to build simulations of it. Dunno how well any of them worked.

15 posted on 11/21/2014 11:32:35 AM PST by doorgunner69
[ Post Reply | Private Reply | To 1 | View Replies]

To: doorgunner69

I was at NAVRADRECFAC IB (or NavSecGruDept, or NavComTelSta, which ever you wanted to call it, we sure had a lot of names!) from 1989-1992 and was CTT3. Good times, and lots of fun EM things going on then.

It was pretty awesome, 0 to 10.2 Ghz intercept range, with HFDF to boot.

Good times...


16 posted on 11/21/2014 12:34:20 PM PST by ro_dreaming (Chesterton, 'Christianity has not been tried and found wanting. ItÂ’s been found hard and not tried')
[ Post Reply | Private Reply | To 15 | View Replies]

To: ro_dreaming
I was working for SAIC at the time of the CG-49 testing. We were contracted to look into compatibility of a new data link. Unfortunately, the SPS-49 honked out harmonics way above it's band and all over where this new link was to work. A low pass filter at one point would have fixed it, but there was resistance to retrofitting.

Dunno if that link was ever installed, cannot recall what the name of it was.

17 posted on 11/21/2014 12:42:58 PM PST by doorgunner69
[ Post Reply | Private Reply | To 16 | View Replies]

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
News/Activism
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson