Free Republic
Browse · Search
News/Activism
Topics · Post Article

Skip to comments.

Romer: Lack of 'Recovery Act signs' Fuels Public Perception of Obama Failure
Wednesday, September 1, 2010 | Kristinn

Posted on 09/01/2010 8:40:58 AM PDT by kristinn

click here to read article


Navigation: use the links below to view more comments.
first previous 1-2021-4041-49 last
To: Netizen

It’s like Obama needs to have his initials on anything he touches to show he was there.”

Here on the ranch- it is called “Marking Territory”.
Stallion does his part.

Dog does his part.

Sooner or later, there is a ‘pee hole’ where they have marked over each other.


41 posted on 09/01/2010 10:18:58 AM PDT by ridesthemiles
[ Post Reply | Private Reply | To 8 | View Replies]

To: Mr. K

It proudly sits on top of the worst road paving I have ever seen.

It is uneven, there is loose gravel all over, and looks worse than it originally did.”

Affirmative Action union workers === On The Job Training done with inferior materials from a big Democrat donor???

Have I got that all correct???


42 posted on 09/01/2010 10:20:52 AM PDT by ridesthemiles
[ Post Reply | Private Reply | To 11 | View Replies]

To: ConjunctionJunction

They spent over $400,000 putting in a traffic circle/turnabout in a rural area when a traffic light would have served the purpose.””””

Those roundabouts are the latest craze in the ‘National Planners” who think that one size or one solution fits all.

Here in N Nevada, there have been 3 of them installed in the last few years. One in Fernley—one in Carson City near the hard core prison- one in Minden next to the high school.

The trucks here in Nevada can run ‘triples, which is a truck + a trailer + a trailer. Hay jaulers- UPS-Fed Ex re the most common. These are quite long. The truck drivers have complained from the beginning about how difficult it is to travel thru these roundabouts. They are just too long a vehicle set up for the size of the roundabout.
They pleaded to not have the one in Fernley built—the ‘NDOT engineers” told them to take another route. Here in rural Northern Nevada, there is not a choice of ‘another route’.

I would bet that left side tires are now being replaced more frequently on these truck units than ever before, as they ride up over the rounded ‘curb’, even at very slow speeds.

I haul a 4 horse trailer & I hate the damn things. They are very intimidating, with the speed of the other vehicles entering at 3 other points, & trying to not toss the horses around inside the trailer. Once I get into the roundabout, I set the speed I want to not jostle the horses. Entering is a bitch.


43 posted on 09/01/2010 10:29:05 AM PDT by ridesthemiles
[ Post Reply | Private Reply | To 17 | View Replies]

To: Thank You Rush

The 7 miles one sign mentions is a brand new part of the highway system completed about 2 years ago.”

Soooo-NObama & Romer are taking credit for things done under Bush!!!

Priceless!!!!


44 posted on 09/01/2010 10:32:48 AM PDT by ridesthemiles
[ Post Reply | Private Reply | To 33 | View Replies]

To: ridesthemiles

I never really thought of big trucks and trailers. I can see how they would have difficulty getting through the traffic circle. I’m now trying to picture a big moving truck (tractor-trailer) trying to get through there or a horse trailer like you have. I can see how it would be a pain in the neck!


45 posted on 09/01/2010 10:36:55 AM PDT by ConjunctionJunction (I can see November from my house!)
[ Post Reply | Private Reply | To 43 | View Replies]

To: LTCJ
Come to think of it, that must be where the economic recovery is...

For a fact, it's where a lot of the stimulus money went. cha ching

46 posted on 09/01/2010 10:40:13 AM PDT by Hoffer Rand (There ARE two Americas: "God's children" and the tax payers)
[ Post Reply | Private Reply | To 29 | View Replies]

To: Netizen

I’m sure AG Holder is looking into this as we speak.
Or, perhaps the current Congress is starting an inquiry...


47 posted on 09/01/2010 10:47:45 AM PDT by MrB (The difference between a (de)humanist and a Satanist is that the latter knows who he's working for.)
[ Post Reply | Private Reply | To 38 | View Replies]

To: Malone LaVeigh

Truth in signage


48 posted on 09/01/2010 4:33:11 PM PDT by RightGeek (FUBO and the donkey you rode in on)
[ Post Reply | Private Reply | To 15 | View Replies]

To: Thank You Rush

PennDot rebuilt a bridge here and the work was being finished around the time of the Porkulus passing. They actually had 2 of these signs installed after traffic had already been going over the bridge again and the workers were sweeping up. This work was finished way before the stimulus.


49 posted on 09/02/2010 10:53:42 AM PDT by vlad335
[ Post Reply | Private Reply | To 33 | View Replies]


Navigation: use the links below to view more comments.
first previous 1-2021-4041-49 last

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
News/Activism
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson