LAKE NORMAN, N.C. - Nuclear reactors across the Southeast could be forced to throttle back or temporarily shut down later this year because drought is drying up the rivers and lakes that supply power plants with the awesome amounts of cooling water they need to operate.
Utility officials say such shutdowns probably wouldn't result in blackouts. But they could lead to shockingly higher electric bills for millions of Southerners, because the region's utilities could be forced to buy expensive replacement power from other energy companies.
Already, there has been one brief, drought-related shutdown, at a reactor in Alabama over the summer.
"Water is the nuclear industry's Achilles' heel," said Jim Warren, executive director of N.C. Waste Awareness and Reduction Network, an environmental group critical of nuclear power. "You need a lot of water to operate nuclear plants." He added: "This is becoming a crisis."
An Associated Press analysis of the nation's 104 nuclear reactors found that 24 are in areas experiencing the most severe levels of drought. All but two are built on the shores of lakes and rivers and rely on submerged intake pipes to draw billions of gallons of water for use in cooling and condensing steam after it has turned the plants' turbines.
Because of the yearlong dry spell gripping the region, the water levels on those lakes and rivers are getting close to the minimums set by the Nuclear Regulatory Commission. Over the next several months, the water could drop below the intake pipes altogether. Or the shallow water could become too hot under the sun to use as coolant.
"If water levels get to a certain point, we'll have to power it down or go off line," said Robert Yanity, a spokesman for South Carolina Electric & Gas Co., which operates the Summer nuclear plant outside Columbia, S.C.
Extending or lowering the intake pipes is not as simple at it sounds and wouldn't necessarily solve the problem. The pipes are usually made of concrete, can be up to 18 feet in diameter and can extend up to a mile. Modifications to the pipes and pump systems, and their required backups, can cost millions and take several months. If the changes are extensive, they require an NRC review that itself can take months or longer.
Even if a quick extension were possible, the pipes can only go so low. It they are put too close to the bottom of a drought-shrunken lake or river, they can suck up sediment, fish and other debris that could clog the system.
An estimated 3 million customers of the four commercial utilities with reactors in the drought zone get their power from nuclear energy. Also, the quasi-governmental Tennessee Valley Authority, which sells electricity to 8.7 million people in seven states through a network of distributors, generates 30 percent of its power at nuclear plants.
While rain and some snow fell recently, water levels across the region are still well below normal. Most of the severely affected area would need more than a foot of rain in the next three months an unusually large amount to ease the drought and relieve pressure on the nuclear plants. And the long-term forecast calls for more dry weather.
At Progress Energy Inc., which operates four reactors in the drought zone, officials warned in November that the drought could force it to shut down its Harris reactor near Raleigh, according to documents obtained by the AP. The water in Harris Lake stands at 218.5 feet just 3 1/2 feet above the limit set in the plant's license.
Lake Norman near Charlotte is down to 93.7 feet less than a foot above the minimum set in the license for Duke Energy Corp.'s McGuire nuclear plant. The lake was at 98.2 feet just a year ago.
"We don't know what's going to happen in the future. We know we haven't gotten enough rain, so we can't rule anything out," said Duke spokeswoman Rita Sipe. "But based on what we know now, we don't believe we'll have to shut down the plants."
During Europe's brutal 2006 heat wave, French, Spanish and German utilities were forced to shut down some of their nuclear plants and reduce power at others because of low water levels some for as much as a week.
If a prolonged shutdown like that were to happen in the Southeast, utilities in the region might have to buy electricity on the wholesale market, and the high costs could be passed on to customers.
"Currently, nuclear power costs between $5 to $7 to produce a megawatt hour," said Daniele Seitz, an energy analyst with New York-based Dahlman Rose & Co. "It would cost 10 times that amount that if you had to buy replacement power especially during the summer."
At a nuclear plant, water is also used to cool the reactor core and to create the steam that drives the electricity-generating turbines. But those are comparatively small amounts of water, circulating in what are known as closed systems that is, the water is constantly reused. Water for those two purposes is not threatened by the drought.
Instead, the drought could choke off the billions of gallons of water that pass through the region's reactors every day to cool used steam. Water sucked from lakes and rivers passes through pipes, which act as a condenser, turning the steam back into water. The outside water never comes into direct contact with the steam or any nuclear material.
At some plants those with tall, Three Mile Island-style cooling towers a lot of the water travels up the tower and is lost to evaporation. At other plants, almost all of the water is returned to the lake or river, though significantly hotter because of the heat absorbed from the steam.
Progress spokeswoman Julie Hahn said the Harris reactor, for example, sucks up 33 million gallons a day, with 17 million gallons lost to evaporation via its big cooling towers. Duke's McGuire plant draws in more than 1 billion gallons a day, but most of it is pumped back to its source.
Nuclear plants are subject to restrictions on the temperature of the discharged coolant, because hot water can kill fish or plants or otherwise disrupt the environment. Those restrictions, coupled with the drought, led to the one-day shutdown Aug. 16 of a TVA reactor at Browns Ferry in Alabama.
The water was low on the Tennessee River and had become warmer than usual under the hot sun. By the time it had been pumped through the Browns Ferry plant, it had become hotter still too hot to release back into the river, according to the TVA. So the utility shut down a reactor.
David Lochbaum, nuclear project safety director for the Union of Concerned Scientists, warned that nuclear plants are not designed to take the wear and tear of repeatedly stopping and restarting.
"Nuclear plants are best when they flatline when they stay up and running or shut down for long periods to refuel," Lochbaum said. "It wears out piping, valves, motors."
Both the industry and NRC spokesman Scott Burnell said plants can shut down and restart without problems.
Just when ya need something to cheer ya up..
No worry in wonât be long till globull warming melts the ice caps and brings the ocean to them.
This article is interesting. My uranium mine is concerned, short term.
Duke’s Allen plant (coal burning, I think) just a few miles downstream of Lake Norman was forced to shutdown last summer for about a week when the river water temps got too high due to less water being released from the lake.
I think most larget thermal plants have an achilles heel when it comes to the adequacy of their heat sinks, be it run of river (temps or flows) or lake (temps and level). The nukes aren’t in a different boat.
Now when you are having to shutter a unit that dispatches at sub $10/MWh and have to replace that capacity with gas/oil combined or simple cycle turbines dispatching at $56-$200/MWh you might see it in your bill...
If the nukes are forced off in the Carolinas, undoubtedly coal stations may be susceptible to derates and shuttering as well because of thermal limits, pond levels, or low river flows— now you are talking a real capacity crisis.
Look to Georgia to get the “capacity crisis” kicked off this year; a lot of people may find themselves short in a lean market.
What’s overlooked here is there are loads on the rivers/lakes in the Carolinas and Georgia that will probably be lost as their suctions are uncovered. That should help cover a capacity shortfall at the cost of salaries, jobs and produced goods and services...
Carolyn
Thank God for Global Warming.
Once the Poles melt, the oceans will rise and flood the lake, restoring the plant’s water supply...unless the plant, too, is flooded....
Sorry. You beat.
Is there anything happening in this country that’s not doom and gloom? There’s the weather, the stock market, the horrible government debt...where does it end?
When the Dems control everything of course.
P.S. its an election year
If this happens, on an extensive scale (several plants) during the winter or summer peak, there could be outages. The reserve “cushion” is thinner these days than it was 10 years ago.
As the Carolinas and Georgia are summer peaking, there could be some serious puckering in those markets w/r to reserve margins as the drought in combination with above average temps could push the situation into a capacity crisis.
Look for some pretty high prices if the rain gauge isn’t filling at average or above rates in GA, SC, NC and Eastern TN this winter and early spring.
They drought may likely end this spring. The Tennessee Valley went through one worse than this in 1986. By late spring 1987 there was plenty of water for all. The bad part is up to a eight inches may arrive in one delivery but that will be the drought breaker though.
This is interesting as we have a big fight going on in my south Texas area about a proposed Nuke plant being built.
Everyone is concerned about its high water usage and the effect on our river and ground water wells.
San Antonio, north of us is already trying to control more of the river water that heads our way.
Carolyn
The nuke plant here in AZ uses treated sewage water, then the water is treated more and then stored to use in the plant’s cooling towers. I think all of a nuke plants should be doing this. It may not be feasible for some, but all new ones should be built in this manner.
Sounds good. I have not studied up on it as I should be doing.
I do not know much about nuclear power plants. I was curious about Palo Verde and how it gets it’s water, since I read this thread.
Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.