Or easier to build. If you’re going to add stuff that eats a lot of electricity to an already existing parking garage where is the most highest capacity electrical wiring already? By the elevators.
Good Point, I never really thought about that.
However, when heavy gauge wire is X amount per foot. The closer to the elevator shaft probably makes it less expensive to install.