Lockheed engineers should look at redesigning critical failure points on the wings and develop an inspection and maintenance schedule to address stress fractures and mechanical failures.
Hopefully it just the older C-130 models and of the later ones.
If the Lockheed Electra should prove a point about wing loading and wing failure.