To: ransomnote
29 million to fill tunnels would most likely involve pumped concrete. Possibly from the mainland.
2,241 posted on
04/04/2018 11:22:44 AM PDT by
buffaloguy
(Bond arms Cowbot)
To: buffaloguy
I was thinking a suction dredge just offshore. Pump them full of sand and whatever size rocks will pass through the impellers.
2,243 posted on
04/04/2018 11:25:53 AM PDT by
EMI_Guy
("You have to slow down to go fast." - Kenny Roberts)
To: buffaloguy
With those kinds of volume and a need to merely fill ( as opposed to construct) tunnels youd just put a portable batch plant there and mix native soil/sand into a .5-1 sack slurry and pump them full...
2,431 posted on
04/04/2018 2:15:58 PM PDT by
Axenolith
(The next time you suffer from the itching, burning and swelling of Pelosies use Preperation MAGA!)