Part of the 10 Freeway was closed for 3 months after the 94 earthquake and we managed to survive. Lots of hype on this.
If I understand this correctly; only one side of the highway is being repaired. Same thing to happen on the other side in November.
Why not do all of it at once - since the entire highway (both directions) is/are closed????