Free Republic
Browse · Search
General/Chat
Topics · Post Article

Skip to comments.

This is spooky....
March 16, 2012

Posted on 03/16/2012 2:43:26 PM PDT by BenLurkin

Articles posted about the "Utah Data Center and NSA's operation "Stellar Wind" are disappearing off of FreeRepubilc, as though they were never there!


TOPICS: Computers/Internet; Weird Stuff
KEYWORDS: nsa; stellarwind; utahdatacenter
Navigation: use the links below to view more comments.
first 1-2021-4041-60 next last

1 posted on 03/16/2012 2:43:27 PM PDT by BenLurkin
[ Post Reply | Private Reply | View Replies]

To: BenLurkin

Are you logged in?


2 posted on 03/16/2012 2:46:03 PM PDT by Moose Burger
[ Post Reply | Private Reply | To 1 | View Replies]

To: BenLurkin

Ruh roh!

3 posted on 03/16/2012 2:50:24 PM PDT by T Minus Four
[ Post Reply | Private Reply | To 1 | View Replies]

To: Moose Burger

I was too slow.

But he is right, just the other day I posted and there were responses. I thought it might be related to but from told me is was really .


4 posted on 03/16/2012 2:51:24 PM PDT by dangerdoc (see post #6)
[ Post Reply | Private Reply | To 2 | View Replies]

To: BenLurkin

Is this hugh and series?


5 posted on 03/16/2012 2:51:38 PM PDT by righttackle44 (I may not be much, but I raised a United States Marine.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: BenLurkin

What is a “Utah Data Center”?


6 posted on 03/16/2012 2:54:14 PM PDT by GladesGuru (In a society predicated upon freedom, it is necessary to examine principles."...the public interest)
[ Post Reply | Private Reply | To 1 | View Replies]

To: Moose Burger

don’t think you can post unless logged in.
Also Ben has been around awhile and I’d give him the benefit.
Also just maybe a few folks may google it and learn, just maybe.
Course the gubmint has been doing this through Eschelon for decades. Careful what you say or post.


7 posted on 03/16/2012 2:55:30 PM PDT by Joe Boucher ((FUBO) Hey Mitt, F-you too pal)
[ Post Reply | Private Reply | To 2 | View Replies]

To: GladesGuru

http://www.theblaze.com/stories/new-details-on-nsas-new-spy-center-and-secrets-from-domestic-eavesdropping-operation-stellar-wind/


8 posted on 03/16/2012 2:56:20 PM PDT by BenLurkin (This is not a statement of fact. It is either opinion or satire; or both)
[ Post Reply | Private Reply | To 6 | View Replies]

To: GladesGuru
What is a “Utah Data Center”

Dude. It's the Center where they keep Data. It's in Utah.

9 posted on 03/16/2012 2:57:16 PM PDT by tnlibertarian (nairatrebilnt)
[ Post Reply | Private Reply | To 6 | View Replies]

To: BenLurkin

Noticed that myself.


10 posted on 03/16/2012 2:58:34 PM PDT by DuncanWaring (The Lord uses the good ones; the bad ones use the Lord.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: T Minus Four

11 posted on 03/16/2012 2:58:34 PM PDT by Joe 6-pack (Que me amat, amet et canem meum)
[ Post Reply | Private Reply | To 3 | View Replies]

To: GladesGuru
Utah Data Center

July 23, 2010 in Military Installations

The Utah Data Center (UDC) will be a highly secure 65 Mega Watt, Tier III National Security Agency datacenter facility to be located near Camp Williams, Utah. The fast-track program will consist of approximately 1 million square feet of new facilities, of which 100,000 ft2 will be mission-critical space with raised flooring, and the other 900,000 ft2 will be devoted to technical support and administrative space. Ancillary support facilities include water treatment facilities, electrical substations, a vehicle inspection facility and visitor control center, perimeter site security measures, fuel storage, chiller plants and fire suppression systems. The UDC will incorporate green building strategies and will be required to be a LEED certified facility, with the goal of obtaining a LEED Silver rating. 1

The construction of the facility has been broken into three phases.

Phase 1: 30 MW facility

A page from the 2010 Defense Budget justifications describes the initial phase of the project:

Construct 30 MW technical load data center to include modular structural components, finished flooring (both raised and administrative), ceiling, lighting, electrical, generators and associated air pollution control systems, mechanical, ventilation, and fire suppression. Also, these funds will provide utilities to include building electrical service, chilled water systems, communications, water, sanitary sewer and storm water management. Installed infrastructure will support 65MW technical load data center capacity for future expandability. The design is to be capable of Tier 3 reliability. Power density will be appropriate for current state-of-the- art high-performance computing devices and associated hardware architecture. U.S. Government and local support services will be provided. Security measures for this project include, but are not limited to a Visitor Control Center provided for data center personnel which is separate from the interim Visitor Control Center for construction personnel; perimeter security; and access control facilities. Physical and technical security of the construction site will be assured.

This project will be designed in accordance with the Uniform Federal Accessibility Standards (UFAS)/Americans with Disabilities Act (ADA) Accessibility Guidelines, Antiterrorism Force Protection (ATFP) standards and Unified Facilities Criteria (UFC) design standards.

PROJECT: Construct a 30 MW technical load data center and infrastructure for 65MW technical load data center capacity.

REQUIREMENT: This project is required to provide a 30MW technical load data center and infrastructure for 65MW technical load data center capacity to support mission. The project will include the following:

(1) Site
(a) Facility design goal will be to the highest LEED standard attainable within available resources and will include: sustainable site characteristics, water and energy efficiency, materials and resources criteria, and indoor environmental quality.
(b) Mechanical and electrical plants are to be housed in separate structures to prevent transfer of noise and vibrations to the data centers

(2) Facilities
(a) Data center technical load of 30 MW distributed across raised floor are the design parameters for the facility.
(b) The infrastructure support and administrative areas will be designed to support state-of-the-art high-performance computing devices and associated hardware architecture.
(c) Slab floor loading of approximately 1500 pounds per square foot (PSF)
(d) Enhancements to the building for IT and security include construction as a sensitive compartmented information facility (SCIF), as well as, requirements related to Antiterrorism Force Protection (ATFP).

(3) Structural
(a) Technical load will be distributed across the data center areas.
(b) Seismic considerations are to be made in the facility design.
(c) Data center areas are to have depressed concrete slab construction with a load bearing capacity of 1500 pounds per square foot
(PSF).
(d) Facility command and control contained in a central modular office component.
(e) Facility will have a loading dock with vehicle bays, three (3) of which are to be equipped with dock levelers sized to handle tractor trailers.

(4) Electrical
(a) Technical load capacity is 30 MW with loads distributed evenly across the data center areas.
(b) Supervisory Control and Data Acquisition (SCADA) to either PDU level or distribution panel level if required
(c) Dedicated substation for each critical UPS.
(d) UPS and generator backup for facility systems.
(e) Generators will include Selective Catalytic Reduction (SCR) pollution control equipment, chemical storage tanks and feed system.

(5) Mechanical
(a) Chilled water system to support both air and water cooled equipment.
(b) Each data center area is to have air cooled and water cooled equipment with Computer Room Air Handlers (CRAHs) located external to the raised floor area. The piping headers / systems are to be designed to accommodate future expansion.
(c) Back-up capability for mechanical equipment.
(d) Cooling Towers
(e) Air distribution redundancy for CRAHs.
(f) Fire Protection – Double interlocked pre-action fire protection system for all electrical and mechanical support spaces.
(g) Wet pipe for administrative and raised floor areas per DOD standards.

(6) Security systems
(a) Video surveillance
(b) Intrusion detection
(c) Access control system

Information on Phases 2 and 3 is welcome.

Project Contractor Information

In November 2009, the U.S. Army Corps of Engineers held two “Industry Days” for potential contractors interested in bidding on Utah Data Center contracts. The following two lists include the complete names, address, and contact information of all attendees to these events. A briefing given at these events is also available.

Location and Construction Photos

Camp Williams
Riverton, UT 84065

Overview of Camp Williams site. UDC will be located on the west side of the highway, on what was previously an airfield.

Layout of the UDC at Camp Williams.

Site layout from a U.S. Army Corps of Engineers brief.


UDC site looking west.

Utah Data Center site prior to construction.

Construction activity at the site, photo from June 2010.

Vehicles at the construction site.

Northern portion of the site. Notice the long black cable running from the side of the road, as well as the beginnings of fencing.

Conceptual layout of data halls to be constructed in UDC.

Source notes:

  1. Utah Data Center. Louis Berger Group. Retrieved July 20, 2010. http://www.louisberger.com/OurProjects/North-America/Utah-Data-Center [↩]

12 posted on 03/16/2012 3:05:40 PM PDT by Theoria (Rush Limbaugh: Ron Paul sounds like an Islamic terrorist)
[ Post Reply | Private Reply | To 6 | View Replies]

To: dangerdoc

“I thought it might be related to but from told me is was really .”

Well said!


13 posted on 03/16/2012 3:05:56 PM PDT by saganite (What happens to taglines? Is there a termination date?)
[ Post Reply | Private Reply | To 4 | View Replies]

To: BenLurkin

Now that you mention it... I’m not finding any threads about Project Miranova Darksphere and the Schenectady, NY Impound either.


14 posted on 03/16/2012 3:06:24 PM PDT by GreenAccord (Bacon Akbar)
[ Post Reply | Private Reply | To 1 | View Replies]

To: saganite

ROFLMAO!!!!!


15 posted on 03/16/2012 3:07:53 PM PDT by doc1019 (Romney will never get my vote!)
[ Post Reply | Private Reply | To 13 | View Replies]

To: Southside_Chicago_Republican

Later.


16 posted on 03/16/2012 3:10:46 PM PDT by Southside_Chicago_Republican
[ Post Reply | Private Reply | To 1 | View Replies]

To: righttackle44

Is Bigfoot involved?


17 posted on 03/16/2012 3:11:48 PM PDT by AEMILIUS PAULUS (It is a shame that when these people give a riot)
[ Post Reply | Private Reply | To 5 | View Replies]

To: BenLurkin


18 posted on 03/16/2012 3:17:40 PM PDT by JoeProBono (A closed mouth gathers no feet - Mater tua caligas gerit ;-{)
[ Post Reply | Private Reply | To 1 | View Replies]

To: BenLurkin

19 posted on 03/16/2012 3:20:39 PM PDT by Dallas59 (President Robert Gibbs 2009-2011)
[ Post Reply | Private Reply | To 1 | View Replies]

To: BenLurkin

I googled Stellar Wind, and it seems to be an NSA wiretapping program.

Nothing new about that—it started under Bill Clinton. Although I suppose they are probably now cranking up something much more sophisticated.


20 posted on 03/16/2012 3:23:45 PM PDT by Cicero (Marcus Tullius)
[ Post Reply | Private Reply | To 1 | View Replies]


Navigation: use the links below to view more comments.
first 1-2021-4041-60 next last

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
General/Chat
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson