To: Professional Engineer
And furthermore! I just noticed this fool drew ALL his switches as normally closed open on fall. And there were other switch symbols required on this schematic on the exam.
*elf banging hand into forehead*
I *really* expected more from a guy who already is an electrical engineer. Wonder if he is okay with drafters doing stuff *for* him that is this crappy?
Not picking on you.... need a sympathetic ear!
3,501 posted on
02/09/2004 5:47:22 PM PST by
Wneighbor
(Lone Star Moot the Kim-n-Kim Birthday Bash!)
To: Wneighbor
I've gotten fed up with drafters that won't try to use the correct switch symbols. I mean there's a $100 cost difference between a single pole toggle switch and an infrared occupancy sensor!
That 100amp fused disconnect is a whole lot more than 40% more than the 60amp unit. GRRRR
3,506 posted on
02/09/2004 5:55:57 PM PST by
Professional Engineer
(Spirit/Opportunity~0.002acres of sovereign US territory~All Your Mars Are Belong To USA)
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson