To: Kenny Bania
Exactly, cost overruns and delayed openings.
7 posted on
04/05/2024 7:13:39 PM PDT by
realcleanguy
(quickly things are falling apart, now that the )
To: realcleanguy
Rebuilt by union labor with chinese steel and mexican labor.
What could go wrong?
25 posted on
04/05/2024 7:57:25 PM PDT by
Texas resident
(Biden=Obama=Jarrett=Soros)
To: realcleanguy
The aim of a project like this is to have the HIGHEST possible costs with the LOWEST possible oversight, and it being totally controlled by democrats. This insures the maximum amount of $$$ flows into the right pockets.
60 posted on
04/06/2024 5:29:12 AM PDT by
Rlsau1
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson