I wanted to do mine six years ago when I bought the property but decided to wait until I started drawing social security (happened last November). Bailed out to the country in March to avoid zombie apocalypse and decided to go ahead and get it done. I think everyone in the country had the same idea...it was hard to get quotes. Went with Summertown Metals...Mennonite owned company. Real happy with results. Garage doors being installed today.
I wanted to do mine six years ago when I bought the property but decided to wait until I started drawing social security (happened last November).
I used Sturdibuilt out of Greensburg. They guys that actually built it are Mennonite. The quality blew me away. The concrete floor could be a roller skating rink. :)
The last ten feet (30x10) is just an extension of the roof and a concrete porch. The 16x30 section next to it is the windowed part with the french doors. It will be the “mancave”, small project area.
I did get a floor to ceiling section of shelving in right after it was built, as well as two rolling 2z6 carts. But I refuse to pay the modern lumber prices for the rest. I don’t need it that bad. It’s a matter of principle.