Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: Red Badger
It was built/molded on the side of the road, then lifted with a crane across the road..............

They wheeled it into place.

And there does appear to be some rebar in there ... and very thick cables. But not enough to support the weight of the bridge over a 6 lane divided roadway.

242 posted on 03/15/2018 12:54:30 PM PDT by al_c (LIBERAL - Laughable Iconsiderate Blaming Entitled Ranting Anti-christian Loudmouth)
[ Post Reply | Private Reply | To 224 | View Replies ]


To: al_c

The center supports were taken out?......................


246 posted on 03/15/2018 12:55:40 PM PDT by Red Badger (The people who call Trump a tyrant are the same people who want the president to confiscate weapons.)
[ Post Reply | Private Reply | To 242 | View Replies ]

To: al_c

Had they just left ONE of those moveable stanchions in place it would still be there..............


250 posted on 03/15/2018 12:57:21 PM PDT by Red Badger (The people who call Trump a tyrant are the same people who want the president to confiscate weapons.)
[ Post Reply | Private Reply | To 242 | View Replies ]

To: al_c

That is probably not rebar, but the ends of post tensioning steel. Prestresed concrete includes steel elements.


317 posted on 03/15/2018 1:20:23 PM PDT by Romulus
[ Post Reply | Private Reply | To 242 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson