Existing line but are the/have the tracks been replaced in anticipation of the new service?
https://www.wsdot.wa.gov/Projects/Rail/PNWRC_PtDefiance/default.htm
Rail was upgraded. Test trains certified the road up to 79 mph.
At least read to the second sentence ...
The TV coverage has shown that the line has had very recent, extensive rework of the right of way and road bed. The article says new track.
Check out the rail “alignment” as it goes over the bridge in the last pic of #24.