Skip to comments.
A Concrete Sample Was Pulled from the New Panama Canal Locks and It Does Not Look Good
gCaptain ^
| August 27, 2015
| Mike Schuler
Posted on 08/28/2015 7:21:18 AM PDT by artichokegrower
A core sample pulled from the concrete of the Cocoli Locks where cracks and leaks have appeared does not bode well for the Panama Canal expansion project, which is on a strict deadline for completion in April 2016.
The crack and subsequent leaks appeared recently in the concrete of one of the interior chambers of the new Cocoli Locks on the Pacific side of the waterway during testing of the new locks.
(Excerpt) Read more at gcaptain.com ...
TOPICS: Culture/Society; Mexico
KEYWORDS: canal; mexico; nicaragua; panama; panamacanal
Navigation: use the links below to view more comments.
first previous 1-20, 21-40, 41-47 last
To: Balding_Eagle
They probably took a safety meeting break.
Safety guy could only do one meeting. LOL
Honestly, this looks like one hell of a problem.
41
posted on
08/28/2015 9:47:56 AM PDT
by
right way right
(May we remain sober over mere men, for God really is our one and only true hope.)
To: Starstruck
Interesting, If you seen footage of the pouring in the old films they made every block in thr dam is a different puzzle size and that is the method of locking together they used. You may have seen this documentary. My grandfather worked on it so, it is especially interesting to me.
https://youtu.be/XnPi3FdNBYc
42
posted on
08/28/2015 9:55:13 AM PDT
by
right way right
(May we remain sober over mere men, for God really is our one and only true hope.)
To: artichokegrower
43
posted on
08/28/2015 10:08:59 AM PDT
by
Magnum44
(I dissent)
To: null and void
Well get our crack troops right on it!There's also a lot of crackheads we could ship down there to work on it.
44
posted on
08/28/2015 10:14:46 AM PDT
by
Lazamataz
(Ok. We won't call them 'Anchor Babies'. From now on, we shall call them 'Fetal Grappling Hooks'.)
To: Buckeye McFrog; Nachum; SoothingDave; thackney
Will buy the ChiComs time to complete their sea-level canal through Nicaragua. You noticed that also, didn't you?
45
posted on
08/28/2015 11:50:56 AM PDT
by
Robert A Cook PE
(I can only donate monthly, but socialists' ABBCNNBCBS continue to lie every day!)
To: Buckeye McFrog
The proposed Nicaragua canal would require locks as well. Lake Nicaragua is 107 feet above sea level.
46
posted on
08/28/2015 12:19:00 PM PDT
by
thackney
(life is fragile, handle with prayer)
To: Buckeye McFrog; All
Will buy the ChiComs time to complete their sea-level canal through Nicaragua
They will need at least 100 years to finish that mess; extremely unlikely it will ever be completed.
47
posted on
08/28/2015 1:32:54 PM PDT
by
notdownwidems
(Washington DC has become the enemy of free people everywhere)
Navigation: use the links below to view more comments.
first previous 1-20, 21-40, 41-47 last
Disclaimer:
Opinions posted on Free Republic are those of the individual
posters and do not necessarily represent the opinion of Free Republic or its
management. All materials posted herein are protected by copyright law and the
exemption for fair use of copyrighted works.
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson