Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: Bubba_Leroy
In the early 1970s, the South Texas Nuclear Project was still being sold based on the “too cheap to meter” claim.

I don't agree.

The actual construction cost ended up being approximately six or seven times the projected cost.

Not quite that much, but 5.6 times is bad enough. Caused by several factors include multiple significant rule changes by the Fed during design and construction. Root&Scoot contributed to the problems.

57 posted on 10/10/2014 3:01:07 PM PDT by thackney (life is fragile, handle with prayer.)
[ Post Reply | Private Reply | To 55 | View Replies ]


To: thackney
In the early 1970s, the South Texas Nuclear Project was still being sold based on the “too cheap to meter” claim.

I don't agree.

That's my recollection and I am sticking with it, but I was in high school at the time and I have lost a lot of grey cells since then.

58 posted on 10/10/2014 3:07:43 PM PDT by Bubba_Leroy (The Obamanation Continues)
[ Post Reply | Private Reply | To 57 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson