To: waterhill
They have to shut the line down to fix it.
8 posted on
02/11/2023 10:03:32 AM PST by
EBH
(America Blackmailed, The True Story of the World War...Coming Soon)
To: EBH
Redundancy should be in place unless it’s some 40 year old line.
11 posted on
02/11/2023 10:08:51 AM PST by
waterhill
(Resistrain)
To: EBH
Spent a few years in post-refinery construction. At the very least you have schedule 40 primary with a 10 or 20 schedule secondary. This is sabotage.
12 posted on
02/11/2023 10:22:02 AM PST by
waterhill
(Resistrain)
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson