The second line to China, power of siberia 2, begins construction in 2024.
https://nitter.net/spectatorindex/status/1548827623278919680#m
Thanks. Power of Siberia 2 gas pipeline is supposed to go to China from a Russian gas field that is further west of the Siberia #1 gas field. From what I read a few weeks ago.
Which surprised me. I figured #2 pipeline would run parallel with Siberia #1. At any rate, both those Russ gas fields always were too remote for Europe, much better situated for Chinese natural gas consumption.