Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: griffin
I don’t know how many of their hvac and pollution control systems are made in-house. Probably outsourced. But im sure they have tool and die guys to make injection molding tooling for plastic and rubber components.

1. I doubt GM is in the plastic injection molding processes. That would be a Tier 1 supplier, not done in-house so to speak.

2. It takes months to build a plastic injection mold. That could be shortened, yes. But the supply chains for key materials are shaky right now. Better move on this yesterday.

I used to work in sales in a related area of manufacturing -- metal stamping -- and as such I was in/out of a lot of tool & die shops. A few of those built molds as well as stamping dies. Dirty little secret: Most of those shops I called on are long gone.

57 posted on 03/19/2020 3:54:41 AM PDT by Tallguy (Facts be d@mned! The narrative must be protected at all costs!))
[ Post Reply | Private Reply | To 44 | View Replies ]


To: Tallguy

We do aluminum molds in days.....can’t get near as many shots, but just make lots of molds.


60 posted on 03/19/2020 6:16:16 AM PDT by griffin
[ Post Reply | Private Reply | To 57 | View Replies ]

To: Tallguy

There are things to do to expedite everything...but I agree with you on typical lead times and material availability 100%.


62 posted on 03/19/2020 6:19:49 AM PDT by griffin
[ Post Reply | Private Reply | To 57 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson