What was needed was temporary center pillars right at the highway median strip. Once the tower and all the cables are installed you can test and adjust cables and test test test and remove the center pillars. And not be hasty about removing them. Only when you are 1000% sure it will hold minus the center pillars.


83 posted on 03/16/2018 1:26:59 PM PDT by dennisw (The strong take from the weak, but the smart take from the strong)
[ Post Reply | Private Reply | To 1 | View Replies ]


To: dennisw
What was needed was temporary center pillars right at the highway median strip.

I spent several years performing structural dynamics work and studies for the DoD and the first thing I thought was why they didn't have temporary shoring placed at the Median until the support structure and the Cable Stays were installed and tensioned.

Always over-engineer and account for safety, even if the numbers tell you differently.

163 posted on 03/16/2018 2:28:45 PM PDT by OldMissileer (Atlas, Titan, Minuteman, PK. Winners of the Cold War)
[ Post Reply | Private Reply | To 83 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson