Free Republic
Browse · Search
News/Activism
Topics · Post Article

Also

LIVE VIEW: State Emergency Operations Center

1 posted on 02/13/2017 10:20:19 PM PST by Ernest_at_the_Beach
[ Post Reply | Private Reply | View Replies ]


To: darkwing104; onyx; faithhopecharity; Vaduz; mississippi red-neck; NormsRevenge; SunkenCiv; ...

Might be a bit new here.


2 posted on 02/13/2017 10:23:35 PM PST by Ernest_at_the_Beach ( Climate Change no longer mentioned on the White House website)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: Ernest_at_the_Beach
Calif needs to run the regulated spillway at >100k cfs until the reservoir is ~50 ft. below max capacity.

Rebuild the spillway this summer.

3 posted on 02/13/2017 10:25:22 PM PST by Paladin2 (No spellcheck. It's too much work to undo the auto wrong word substitution on mobile devices.)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: Ernest_at_the_Beach; null and void; aragorn; EnigmaticAnomaly; TWhiteBear; WildHighlander57; ...

Oroville dam spillway expected to collapse (Photos and video )

4 posted on 02/13/2017 10:25:51 PM PST by LucyT
[ Post Reply | Private Reply | To 1 | View Replies ]

To: Ernest_at_the_Beach

Here is a link to the long ongoing thread with many photos...
http://www.freerepublic.com/focus/news/3524221/posts


6 posted on 02/13/2017 10:38:12 PM PST by Repeal The 17th (I was conceived in liberty, how about you?)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: Ernest_at_the_Beach

Its monday night and the lake level is almost 8 feet below the emergency spillway, today they dropped riprap and pumped grout into a fissure gouged out by the water, a fissure nobody is talking about. Its stable for now, they cannot use the emergency again and are calling it the auxiliary instead. They cannot prep it enough to use again. Total design failure even at a 5% release rate.

36 hours is the current estimated time left, it’s literally dammed if they do, dammed if they don’t.

Main spillway is at 100,000 cubic feet per second, undamaged it can go more than twice that rate but will flood downstream.

Really depends on the next storm, final solution is they must drain lake low enough so that even with the spring melt they won’t need to use the main spillway which may take six months to rebuild if they went all out. But they also need to get the pennstock valves open at the powerhouse, its flooded.Must get wster below main spillway gates.

I envy the guys sitting across the dam doing live streaming.


11 posted on 02/13/2017 10:44:56 PM PST by Daniel Ramsey (Thank YOU President Trump, finally we can do what America does best, to be the best!)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: Ernest_at_the_Beach; SE Mom; LucyT; WildHighlander57; abb; janetjanet998

Unconfirmed:

This comment is from arfcom’s ProFryan, who was live streaming on Periscope from the dam over the weekend.

2/14/2017 12:02:24 AM EST
All right, I just got home. Where are we at?

Clearly O town is f***ed. The latest pictures show the cracks right beneath the Espill are the deathblow. Anyone with half a brain knows that it’s not Fill it’s decomposed granite or who knows what that’s just rock sitting on top of a rock.

( The word from the people working on it who are not allowed to talk publicly is there are seven monster cracks beneath the emergency spillway )


20 posted on 02/14/2017 12:41:39 AM PST by maggief
[ Post Reply | Private Reply | To 1 | View Replies ]

To: Ernest_at_the_Beach

Placemarker


48 posted on 02/14/2017 11:02:37 AM PST by JDoutrider
[ Post Reply | Private Reply | To 1 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson