I do know of a project that went into a Critical Design Review (CDR) to finalize and approve the design, and one of the required inputs for the CDR was a set of "As-Built" drawings.
I said, "Whoa, I think we're getting ahead of ourselves ..."
16 posted on 06/27/2014 8:18:43 PM PDT by ClearCase_guy
("Harvey Dent, can we trust him?" http://www.youtube.com/watch?v=HBsdV--kLoQ)
I do know of a project that went into a Critical Design Review (CDR) to finalize and approve the design, and one of the required inputs for the CDR was a set of "As-Built" drawings.
Sounds like the National Health Care Plan (or ACA)
33 posted on 06/28/2014 8:02:31 AM PDT by UCANSEE2