Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: 21twelve

it can only back up 2 or 3 feet?

I think that is a design flaw, considering its pretty much stuck there for now.


60 posted on 01/02/2014 9:06:16 PM PST by GeronL (Extra Large Cheesy Over-Stuffed Hobbit)
[ Post Reply | Private Reply | To 56 | View Replies ]


To: GeronL

It does more than just dig the tunnel, it builds the tunnel as it goes, putting up panels every 6 feet or something. Not a design flaw - but yes, a very risky thing.

Several years ago just north of Seattle (but same geology) they built the Brightwater Sewer tunnel. One of the machines got stuck. They brought in another one, which was in the area working on another tunnel, to dig from the opposite direction. The one that got stuck had to be dismantled in the hole and taken out piece by piece.

With the current project, no spare 56-foot diameter TBM’s around though.


73 posted on 01/02/2014 11:50:31 PM PST by 21twelve (http://www.freerepublic.com/focus/f-news/2185147/posts 2013 is 1933 REBORN)
[ Post Reply | Private Reply | To 60 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson