Free Republic
Browse · Search
News/Activism
Topics · Post Article

More on specifics of the Kill effort at the TOD link.
1 posted on 07/26/2010 1:56:55 PM PDT by Ernest_at_the_Beach
[ Post Reply | Private Reply | View Replies ]


To: Sub-Driver; BOBTHENAILER; SunkenCiv; Marine_Uncle; onyx; NormsRevenge; Grampa Dave; SierraWasp; ...

fyi


2 posted on 07/26/2010 1:59:53 PM PDT by Ernest_at_the_Beach ( Support Geert Wilders)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: Ernest_at_the_Beach

They will plug the spill and fire the CEO blame everything on him and bail out on the claims. I bet Obama has already been paid off.


3 posted on 07/26/2010 2:02:33 PM PDT by screaminsunshine (m)
[ Post Reply | Private Reply | To 1 | View Replies ]

the pressure in the well has now risen to just over 6,900 psi… suggesting no flow and that well integrity is apparent.

I thought 8,000 psi was the lowest psi that would "suggest" integrity?

4 posted on 07/26/2010 2:09:04 PM PDT by D-fendr (Deus non alligatur sacramentis sed nos alligamur.)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: Ernest_at_the_Beach

Thank you for hosting the thread.


5 posted on 07/26/2010 2:21:16 PM PDT by UCANSEE2 (The Last Boy Scout)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: justa-hairyape; Marine_Uncle

Discussion on the leaks and whether there is evidence of stuff coming up from the seafloor on today’s thread.


9 posted on 07/26/2010 2:38:38 PM PDT by Ernest_at_the_Beach ( Support Geert Wilders)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: Ernest_at_the_Beach
This morning a tiny clathrate (methane hydrate) storm engulfed the BOP and new hydraulics control panel. Last for 20 to 40 minutes.

In this video the cable on the left held the new Hydraulics panel. BOP on right. ROV video feed was freezing every now and then. Note at the 27 second mark in the center an animal or object floats left to lower right. Notice its speed and compare that to tiny clathrates that were smaller then a golf ball in size.The clathrates accelerate in the flow.

Tiny Clathrate Storm at BOP

In this video you can see how fast the clathrates can accelerate in the dynamic flow. ROV video feed was freezing every now and then. At the 50 second mark the new hydraulics control panel can be seen. At the 1:23 mark estimating max peak speed was 20 feet per second.

Tiny Clathrate Storm at BOP Fast Acceleration

In this video the amazing dynamic vertical flows can be seen in the clathrate storm. Perhaps the clathrates themselves are helping to develop the storm currents. This is due to the methane gas dissolving or diffusing which is giving them propulsion and acceleration.

Tiny Clathrate Storm at BOP Vertical Flows

The clathrate storms are a new anomaly, but the dynamic currents are developing sediment storms on the bottom. We saw the base of the BOP slightly buried yesterday, now the ROV below comes onto the Tool Crib and find the tools buried. Attempts to clear them with thruster flow, but not successful.

ROV Tool Crib Buried

So they need a new tool crib design. Solid walls with a closing solid lid. Would suggest a balloon float to find the tool crib if it gets completely buried.

22 posted on 07/26/2010 3:36:27 PM PDT by justa-hairyape
[ Post Reply | Private Reply | To 1 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson