So because the pressure has built up a little low they are going to run a second pressure test ? This is kind of what I was afraid of. The Well bore is partially compromised. Now what do they do ? Hopefully the seismic runs will tell them exactly why the pressure is not building.
It sounds like the original plan is subject to change.
We don't know that as a fact.
The pressure didn’t build to their 9,000psi projections, so now they’re determining whether 1)the deposit pressure was slightly relieved by the leaked volume, or 2)there are sub- surface faults in or around the casing.
I’m thinking #2