We need maybe a marine engineer or someone who knows a lot about drilling to tell us if it is possible AT ALL for this to have happened due to human tampering.
The number one suspect is the Middle East oil groups. They have much to lose if the US can successfully drill for oil on our own shores.
Someone already posted a conspiracy saying it was a North Korean torpedo.
heh
There should be plenty of those experts all over the news 24/7, but there aren’t any at all.
It’s almost like someone doesn’t want people talking about this.
I wonder why...
There are already some 500 oil wells in the Caribbean, somehow I find it hard to believe the the Middle east oil groups would want to risk the bad publicity on ONE rig.
I was sent this in the mail a few days ago.
The rig belongs to Transocean, the worlds biggest offshore drilling contractor. The rig was originally contracted through the year 2013 to BP and was working on BPs Macondo exploration well when the fire broke out. The rig costs about $500,000 per day to contract. The full drilling spread, with helicopters and support vessels and other services, will cost closer to $1,000,000 per day to operate in the course of drilling for oil and gas. The rig cost about $350,000,000 to build in 2001 and would cost at least double that to replace today.
The rig represents the cutting edge of drilling technology. It is a floating rig, capable of working in up to 10,000 ft water depth. The rig is not moored; It does not use anchors because it would be too costly and too heavy to suspend this mooring load from the floating structure. Rather, a triply-redundant computer system uses satellite positioning to control powerful thrusters that keep the rig on station within a few feet of its intended location, at all times. This is called Dynamic Positioning.
The rig had apparently just finished cementing steel casing in place at depths exceeding 18,000 ft. The next operation was to suspend the well so that the rig could move to its next drilling location, the idea being that a rig would return to this well later in order to complete the work necessary to bring the well into production.
It is thought that somehow formation fluids oil /gas got into the wellbore and were undetected until it was too late to take action. With a floating drilling rig setup, because it moves with the waves, currents, and winds, all of the main pressure control equipment sits on the seabed the uppermost unmoving point in the well. This pressure control equipment the Blowout Preventers, or BOPs as theyre called, are controlled with redundant systems from the rig. In the event of a serious emergency, there are multiple Panic Buttons to hit, and even fail-safe dead man systems that should be automatically engaged when something of this proportion breaks out. None of them were apparently activated, suggesting that the blowout was especially swift to escalate at the surface. The flames were visible up to about 35 miles away. Not the glow the flames. They were 200 300 ft high.
All of this will be investigated and it will be some months before all of the particulars are known. For now, it is enough to say that this marvel of modern technology, which had been operating with an excellent safety record, has burned up and sunk taking souls with it.
The well still is apparently flowing oil, which is appearing at the surface as a slick. They have been working with remotely operated vehicles, or ROVs which are essentially tethered miniature submarines with manipulator arms and other equipment that can perform work underwater while the operator sits on a vessel. These are what were used to explore the Titanic, among other things. Every floating rig has one on board and they are in constant use. In this case, they are deploying ROVs from dedicated service vessels. They have been trying to close the well in using a specialized port on the BOPs and a pumping arrangement on their ROVs. They have been unsuccessful so far. Specialized pollution control vessels have been scrambled to start working the spill, skimming the oil up.
In the coming weeks they will move in at least one other rig to drill a fresh well that will intersect the blowing one at its pay zone. They will use technology that is capable of drilling from a floating rig, over 3 miles deep to an exact specific point in the earth with a target radius of just a few feet plus or minus. Once they intersect their target, a heavy fluid will be pumped that exceeds the formations pressure, thus causing the flow to cease and rendering the well safe at last. It will take at least a couple of months to get this done, bringing all available technology to bear. It will be an ecological disaster if the well flows all of the while; optimistically, it could bridge off down hole.