Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: neverdem
and at tensile loads of up to 35 metric tons per square meter.

So.....once you've connected the two sides....how in Hades do you separate them? With a pair of Caterpillar D9s?

11 posted on 09/09/2009 10:12:24 AM PDT by Bloody Sam Roberts (An armed man is a citizen. An unarmed man is a subject.)
[ Post Reply | Private Reply | To 1 | View Replies ]


To: Bloody Sam Roberts

A lot smaller surfaces require less force. Imagine a dime sized piece that would take a strong man to pull apart.


12 posted on 09/09/2009 10:49:11 AM PDT by Bogey78O (Don't call them jihadis. Call them irhabis. Tick them off, don't entertain their delusion.)
[ Post Reply | Private Reply | To 11 | View Replies ]

To: Bloody Sam Roberts

How do you fasten it to the substrate?


14 posted on 09/10/2009 4:19:59 AM PDT by bert (K.E. N.P. +12 . fasl el-khital)
[ Post Reply | Private Reply | To 11 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson