I wonder why the charts show no systems with IBM’s new Power 10 CPU’s, only the prior Power 9’s?
Were told where I work if we replace our current Power 9 powered server with a similar size server with a Power 10 CPU and NVMe storage, our IPL time will go from 15 minutes to 35 seconds.
Of course the NVMe storage, successor to solid state, makes up a lot of that speed.
Yeah—I upgraded my 10-yo laptop from dual 5400rpm spinning disks to a new laptop running NVMe. Bootup time (IPL) went down to 18 secs from cold power off to logging in.