I’ll bet that was a bit nose heavy ! Probably should have just put a 9” Ford Axle in it to save the time and mess. I bet it was a ride in a straight line
.
He had the rear ready to install but he wanted to see what the factory pinto rear did. I think it lasted a week. He also took off the nose, welded it all together and put a hinge at the front under the radiator so that it swung away from the firewall to access the engine. The more I think of this thing the more impressed I am. This was a project car dreamed up and done at home in the garage by a highschool senior.