Timber- Let it all burn. That is the California way.
LP in the UP is changing it mill in Sagola over to siding.
They changed the building code around here to allow for 7/16 sheeting instead of the minimum of 1/2 for roofing.
Word is that Potlatch at Sawyer is going full bore. The boys up that way are reducing production in the woods because of costs. Cant afford it.
My brother has been trying to get a home finished in WA state for over a year. He can NOT get blown in insulation for ceiling of his house.
It now takes longer to build a new home than it used to.
It takes longer to get the windows, doors, appliances, flooring, cabinets, electrical panels, etc.
All of the hundreds of manufactured components that go into building a new house/apartment all have increased in price and are taking longer to get. EVERYTHING is UP in price.