No, SG, it isn’t. They need to order a right-hand door. They also need to order a new threshold. I also want a few dozen other things fixed, but the big things are the door and the threshold.
For now, I’m using a “door snake” to stop the worst of the draft cause by replacing the broken threshold with one that was different, so it takes me a while to open the door. It’s like having a series of different locks that all have differing ways of being opened.
Anyway, it will be a week before anything else is addressed. Meanwhile, the left-hand door is sitting in place with a wire being used to pull it closed from the inside or open it from the outside. Too much fun!
How are you doing, Girl?
You’re awake! Now that I got over the excitement, I’ll read your post.
I bet you can't remember when you've had that much fun. Pfeh