I saw a civil engineer comment that said the plans were missing column caps that strengthen the connection between columns and slabs..
That makes the collapse due in part at least to a design defect, in addition to construction defects and a lapse in maintenance. My guess is that the city of Seaside will also be cited for failure to properly inspect the building.