Even without a direct hit from the storm, heavy rain and high winds could overload the remaining, compromised structure. The risk is enhanced by growing doubts as to the quality of the construction. Steel rebar reinforcement specified in the plans seems absent at key points and to be of poor quality.
I’ve been looking at the original structural drawings, and there’s no obvious goof. But was not aware that there have been reports of missing steel. Is that local media? Do you have a link handy?