Just because you have 2, 200 Amp panels doesn’t mean you have 400 amps.


282 posted on 05/24/2021 4:26:22 PM PDT by TexasGator (Z1z)
[ Post Reply | Private Reply | To 261 | View Replies ]


To: TexasGator

Correct. 400 amp services requires 600kcm wire. The demand would never exceed that. So why shell out the $? Answer: You don’t. The higher the volts the lesser gauge wire is required.
Ex 220v at 30amps requires 10awg. 120v a 30amps would require 6awg.


295 posted on 05/24/2021 8:14:32 PM PDT by Brasky (You miss every shot you never take.)