Free Republic
Browse · Search
General/Chat
Topics · Post Article


1 posted on 01/15/2021 10:37:58 AM PST by SeekAndFind
[ Post Reply | Private Reply | View Replies ]


To: SeekAndFind

Under Biden there will be forests of windmills and acres of solar farms and rolling blackouts


2 posted on 01/15/2021 10:41:19 AM PST by The Great RJ ("Socialists are happy until they run out of other people's money." Margaret Thatche)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: SeekAndFind

I have often said that I wish Trump had pushed and funded research into clean nuclear energy during his first term. Our judgment and use of nuclear energy is largely based on technology that is as old as I am and there are many promising new technologies that address many of the concerns with nuclear energy.

Ultimately, nuclear energy is the best answer for our needs and many “honest” environmentalist are reaching the same conclusion.


3 posted on 01/15/2021 10:42:54 AM PST by volunbeer (Find the truth and accept it - anything else is delusional)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: SeekAndFind

I always love the threads that you start even if I play devils advocate.

I assume that you understand that the clamoring for “clean energy” has almost nothing to do with the environment and safety, and everything to do with controlling people and the economy.


4 posted on 01/15/2021 10:43:53 AM PST by fireman15
[ Post Reply | Private Reply | To 1 | View Replies ]

To: SeekAndFind

Just see what the dimodrats do to it and it will blow your mind a second time........


5 posted on 01/15/2021 10:45:27 AM PST by Fiddlstix (Warning! This Is A Subliminal Tagline! Read it at your own risk!(Presented by TagLines R US))
[ Post Reply | Private Reply | To 1 | View Replies ]

To: SeekAndFind

Nuclear energy is the only real solution to carbon emissions. It is the only wat that travel within this solar system will one day be possible. The phony Democrat “environmentalists” are paranoid about nuclear energy and will oppose its development and deployment. Now that they have power, Americans will be entering a dark age.


7 posted on 01/15/2021 10:52:26 AM PST by allendale
[ Post Reply | Private Reply | To 1 | View Replies ]

To: SeekAndFind

The future of nuclear is Enhanced Coulomb Repulsion, which Google got 2 patents for so far, published a peer reviewed article in Nature Magazine, and have a $10M/year program in place looking into it.


9 posted on 01/15/2021 11:43:35 AM PST by Kevmo (I'm in a slow motion Red Dawn reality TV show. The tree of liberty is thirsty.)
[ Post Reply | Private Reply | To 1 | View Replies ]

To: SeekAndFind

I knew this was going to be a technical article when I saw that the 2nd sentence is

“It creates high-paying jobs better than any other energy source.”


11 posted on 01/15/2021 11:46:14 AM PST by cymbeline
[ Post Reply | Private Reply | To 1 | View Replies ]

To: SeekAndFind

Bookmark


13 posted on 01/15/2021 11:59:35 AM PST by aquila48 (Do not let them make you care! Guilting you is how they control you. )
[ Post Reply | Private Reply | To 1 | View Replies ]

To: SeekAndFind

Didn’t address the spent fuel and other waste products issue.


15 posted on 01/15/2021 12:12:17 PM PST by fella ("As it was before Noah so shall it be again,")
[ Post Reply | Private Reply | To 1 | View Replies ]

To: SeekAndFind
I like the kinds of details outlined in this posting. The mega nuc plant model for electrical power has been a boondoggle since inception due to cost control, construction and permitting. This manufacturer built to a standardized and smaller scale seems a way to break this cycle that is stuck on repeat.

A fundamental fault with how legacy nuc plants have been built is that each was a 1-off custom design of immense complexity. A design of immense complexity generates regulatory reviews and permitting of equal complexity. Construction and quality control of that construction is so complicated that very few companies could fully control quality and cost.

All of those items added up to multibillion $$$ cost overruns and in some cases cancellations after spending several billion and not even making it out of engineering (ex. Midland, MI). At the South Texas nuc plant, Brown and Root was fired midway during construction because of quality control nonconformance + cost overruns and replaced by Bechtel.

17 posted on 01/15/2021 2:57:40 PM PST by Hootowl99
[ Post Reply | Private Reply | To 1 | View Replies ]

To: SeekAndFind

24 posted on 01/15/2021 7:38:05 PM PST by Paladin2
[ Post Reply | Private Reply | To 1 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson