Much of ground straps are exposed.
“Much of ground straps are exposed.”
Not my line of work, but when my wife and I put a major addition on our house,we did all the work accept we paid to have the drywall stacked inside the house .
The only non trivial gig we received was a ground violation.
Back to the library and study the code.
Yes I had submitted detailed plans and schematics, that were approved.
We upgraded the service to 300 amp and made the old existing breaker box a slave to the new panel.
Had to run it in ONE INCH HEAVY WALL CONDUIT ( NOT THIN WALL ,NOT IMC)all the way from the old box to a new ground rod out side.
THIS WAS A PROJECT!
And don’t forget the THREE-TWO-BEE TAG, like I did.
This was of course residential and I’m in the next county over. Could all be different.