set to be done construction???
I’ll be watching. Their FCC application sets the date no earlier than October 11th.
The first stage is slated to have something like 27, the count was just reduced because of thrust improvements to the engine design. It uses methane/LOX.
Its pretty neat that they can do these flights without risk to pilots!