Free Republic
Browse · Search
General/Chat
Topics · Post Article

Skip to comments.

Man Who Created His Own Version of Subway Map Has Dispute with MTA
NY1 ^ | Jan. 18, 2020 | Dan Rivoli

Posted on 01/20/2020 12:05:21 AM PST by nickcarraway

click here to read article


Navigation: use the links below to view more comments.
first previous 1-2021-25 last
To: ml/nj

Well I took the 7 train from Queens to Manhattan last month and it looked exactly the same,maybe they are new but I sure as hell didn’t see anything different.


21 posted on 01/20/2020 7:37:25 AM PST by GrandJediMasterYoda (As long as Hillary Clinton remains free equal justice under the law will never exist in the USA)
[ Post Reply | Private Reply | To 16 | View Replies]

To: GrandJediMasterYoda

Same here. Last year. Looked the same as it has for YEARS.


22 posted on 01/20/2020 7:39:06 AM PST by Jane Long (Praise God, from whom ALL blessings flow.)
[ Post Reply | Private Reply | To 21 | View Replies]

To: GrandJediMasterYoda
Well I took the 7 train from Queens to Manhattan last month and it looked exactly the same,maybe they are new but I sure as hell didn’t see anything different.

I take the 7 pretty often, but only from Times Sq to Grand Central. The 7 line used to terminate at Times Sq but has been extended now since 2015 to Hudson Yards. I really don't pay that much attention to the cars but I'm pretty sure that most aren't 40 years old.

About the 7 line, Wikipedis says (in part):

Early 21st century upgrades[edit]

Automation of the line[edit]

In January 2012, the MTA selected Thales for a $343 million contract to set up a communications-based train control (CBTC) system as part of the plan to automate the line. This was the second installation of CBTC, following a successful implementation on the BMT Canarsie Line. The total cost was $550 million for the signals and other trackside infrastructure, and $613.7 million for CBTC-compliant rolling stock.[64] The safety assessment at system level was performed using the formal method Event-B.[81]

The MTA chose the Flushing Line for the next implementation of CBTC because it is also a self-contained line with no direct connections to other subway lines currently in use. Funding was allocated in the 2010–2014 capital budget for CBTC installation on the Flushing Line, with scheduled installation completion in 2016.[11] The R188 cars were ordered so the line would have compatible rolling stock. CBTC on the line will allow the 7 and <7>​ services to run 7% more service, or 2 more trains per hour (tph) during peak hours (before retrofit, it ran 27 tph).[82] However, the system had been retrofitted to operate at 33 tph even without CBTC.[64][83]

The first train of R188 cars began operating in passenger service on November 9, 2013.[84][85] Test runs of R188s in automated mode started in late 2014.[64] However, the CBTC retrofit date was later pushed back to 2017[86] or 2018[87] after a series of problems that workers encountered during installation, including problems with the R188s.[86][87] The project also went over budget, costing $405 million for a plan originally marked at $265.6 million.[86] The whole line was cutover to CBTC operation on November 26, 2018, with the completion of the segment from Hudson Yards to the north of Grand Central.[88]

ML/NJ
23 posted on 01/20/2020 8:32:49 AM PST by ml/nj
[ Post Reply | Private Reply | To 21 | View Replies]

To: GrandJediMasterYoda

I started riding NYC subways in 1970. Continued doing so workdays through the 1990s.

A lot changed during that time. All the older cars were retired or refurbished. The interiors of nearly every subway station were redone, with paint and/or new surface materials. Elevator access has been added to tons of stations, as have escalators in places that previously had only stares. The electric signalling system of the whole network has been redone. Your rarely see the grafitti you used to see covering the inside and outside of so many cars and many stations.

But no, they have not gutted the system’s steel structural support framework and totally rebuilt it in a style it would be built today. And, for the cost of it neither would you.

The price increases since 1947 have not even kept up with inflation. If they had the fare today would be $4.00.

The MTA is a bloated agency, lots of corruption and lots of waste, caused in part by the tons of political manipulation-pressure put on it to do what the politicians want.

But your ideas that nothing has changed and the fare is too much are both wrong.


24 posted on 01/20/2020 8:55:05 AM PST by Wuli
[ Post Reply | Private Reply | To 4 | View Replies]

To: GrandJediMasterYoda

Well, one thing changed... no (c)rap “music” back in 1973. The music the Soul Brothers were playing was a helluva lot better then.


25 posted on 01/20/2020 1:40:19 PM PST by fieldmarshaldj (Dear Mr. Kotter, #Epsteindidntkillhimself - Signed, Epstein's Mother)
[ Post Reply | Private Reply | To 4 | View Replies]


Navigation: use the links below to view more comments.
first previous 1-2021-25 last

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
General/Chat
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson