Free Republic
Browse · Search
General/Chat
Topics · Post Article

To: catnipman
almost guaranteed they were pulling forms before concrete was cured enough

It was a steel framed building with metal deck. It wasn't a concrete framed building.

56 posted on 10/12/2019 4:11:16 PM PDT by Go Gordon (I gave my dog Grady a last name - Trump - because he loves tweets.)
[ Post Reply | Private Reply | To 18 | View Replies ]


To: Go Gordon

“It was a steel framed building with metal deck. It wasn’t a concrete framed building.”

you can see collapsed concrete floor slabs hanging down ... if not cured before loading, they’ll collapse ..


61 posted on 10/12/2019 8:57:07 PM PDT by catnipman (Cat Nipman: Vote Republican in 2012 and only be called racist one more time!)
[ Post Reply | Private Reply | To 56 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson