Very interesting video. I saw pallets of block stacked on the top deck. It appeared that the steel frame on the curtain wall was incomplete but the CMU wall was being constructed. The steel connections were bolted but not welded yet. Buildings which are still under construction are missing structural elements and there are obviously far more risks of collapse than with complete buildings. Tragic.
Interesting how the building split right where the two cranes are and one of the cranes is leaning.
“New Orleans’ top building inspector among those suspended amid federal corruption probe”